ENG
ENGINE REMOVAL
5-2
EXHAUST PIPE
1. Loosen:
• Bolts (Exhaust holder)
• Screw (muffler joint)
2. Remove:
• A.I.S. hose
• Bolts (Exhaust pipe)
• Exhaust pipe
CARBURETOR
1. Remove:
• Fuel tank
• Carburetor
Refer to the “CARBURETOR REMOVAL”
section in chapter 6.
AUTOLUBE PUMP CABLE AND HOSE
1. Remove:
• Autolube pump cover
2. Disconnect:
• hose
(from autolube pump and hose guide)
• Gasket (autolube pump cover
NOTE:
Plug the oil hose so that oil will not run out of
the oil tank.
3. Remove:
• Pump cable
NOTE:
Turn the pump pulley clockwise by finger to
make the pump cable loose enough for its end
to be removed from the pulley.
1
1
2
1
1
2
1
3
Содержание DT125RE 2005
Страница 1: ...SERVICE MANUAL DT125RE1D01 AE1 DT125X 2005 ...
Страница 7: ...GEN INFO ...
Страница 8: ...1 ...
Страница 16: ......
Страница 17: ...SPEC ...
Страница 18: ...2 ...
Страница 39: ...CHK ADJ ...
Страница 40: ...3 ...
Страница 86: ...CHAS ...
Страница 87: ...4 ...
Страница 160: ...ENG ...
Страница 161: ...5 ...
Страница 203: ...ENG ENGINE ASSEMBLY AND ADJUSTMENTS 5 41 MAGNETO ROTOR Stator assembly Rotor Washer 80 Nm 8 0 m kg 58ft lb ...
Страница 223: ...COOL ...
Страница 224: ...6 ...
Страница 239: ...CARB ...
Страница 240: ...7 ...
Страница 255: ...ELEC ...
Страница 256: ...8 ...
Страница 263: ...ELEC IGNITION SYSTEM 8 6 IGNITION SYSTEM The circuit diagram showns the ignition system ...
Страница 270: ......
Страница 271: ...ELEC CHARGING SYSTEM 8 14 EAS00773 CHARGING SYSTEM CIRCUIT DIAGRAM Generator Rectifier regulator Battery Main fuse ...
Страница 282: ......
Страница 295: ...ELEC COOLING SYSTEM 8 38 EAS00807 COOLING SYSTEM CIRCUIT DIAGRAM Battery Main switch Main fuse 13 Thermo switch ...
Страница 307: ...TRBL SHTG ...
Страница 308: ...9 ...
Страница 319: ...DT125 WIRING DIAGRAM ...