–5–
CABLE ROUTING
SPEC
R Route the (–) and AC magneto
leads under the wire harness.
S Route under the wire harness to
the assembling point .
T Insert the holding clamp of the
wire harness to the frame.
U Fasten the wire harness with the
clamp inserted to the frame.
V Route the radiator fan motor lead
above the wire harness.
W Assembling point
Beneath the under bracket
X Route the handlebar switch lead
and main switch leads along the
groove of the guide-air.
Y To cord headlight
1
3
Z Route the starter motor lead
through the clamp inserted to the
box battery.
AA Route the starter motor lead
through the clamp inserted to
the box battery.
AB Clamp the lead as being in
parallel along the fender.
Make sure to clamp three
leads.
AC Fasten the wire harness with
the clamp inserted to the hole
of the box battery.
AD Routing position of each lead
except the wire harness is not
regulated in the clamp.
AE Branch from the main harness
AF Assembling point
Beneath the under bracket,
below the cover steering
AG Throttle cable should not be
placed on the rib of guide-air.
AH To coolant temperature sensor
AI Do not pinch the handlebar
switch lead when assembling
the ignition coil plate.
AJ Pass the filter of throttle body
through the notch of the rub-
ber baffle and release it under
the ignition coil plate.
4
Содержание 5PW1-SE2
Страница 1: ...Yamaha Motor Co Ltd 2003 YZF R1 R 5PW1 SE2 SERVICE INFORMATION ...
Страница 18: ...YZF R1 R 2003 WIRING DIAGRAM EUR ...
Страница 20: ...YZF R1 R 2003 WIRING DIAGRAM OCE ...
Страница 21: ......