–7–
CABLE ROUTING
SPEC
1
Turn signal light lead
2
Radiator hose
3
Reservoir tank breather hose
(L = 440)
4
Clutch cable
5
Crankshaft position sensor lead
6
Rear brake switch lead
7
Wiring section
8
Coolant breather hose
9
Clutch cable
10
Handlebar switch lead
11
Main switch lead
12
Assembling point
13
Assembling point
14
Wiring section
3
3
4
1
A Route the clutch cable through
the backward of radiator bracket
and inside of coolant breather
hose.
B To cord headlight.
C To turn signal light.
D Point the open side to the vehicle
outside.
E Fasten the clutch cable with the
clamp to the inside of the coolant
reservoir tank.
F Fasten the sidestand switch lead
behind the bracket and cut the
tip.
G To fuel tank.
H Pass the throttle cable in front of
the brake hose.
I Pass the clutch cable behind the
front fork.
J Pass the handlebar switch lead
and main switch lead between
the steering stopper and front
fork outer tube.
K Pass the throttle cable, handle-
bar switch lead between the un-
der bracket and the cover steer-
ing. There should be no twist and
crossing of the cable.
L In this area, the handlebar switch
lead (right side) should not be in
front of the throttle cable. It
should not cross the throttle
cable around the guide-air.
Содержание 5PW1-SE2
Страница 1: ...Yamaha Motor Co Ltd 2003 YZF R1 R 5PW1 SE2 SERVICE INFORMATION ...
Страница 18: ...YZF R1 R 2003 WIRING DIAGRAM EUR ...
Страница 20: ...YZF R1 R 2003 WIRING DIAGRAM OCE ...
Страница 21: ......