ENG
5-50
2
1
3
2
1
5. Install:
8
secondary sheave
1
8
spring
8
clutch carrier
2
TIP
Attach the clutch spring holder
3
and clutch
spring holder arm
4
onto the secondary sheave
as shown. Then, compress the spring, and
tighten the clutch carrier nut
5
.
Clutch spring holder
90890-01337 (YM-33285)
BELT DRIVE
T
R
.
.
EAS00325
INSTALLING THE SECONDARY SHEAVE, V-
BELT AND PRIMARY SHEAVE
1. Install:
8
V-belt
1
8
secondary sheave
2
NOTICE
Do not allow grease to contact the V-belt and
secondary sheave.
TIP
8
Install the V-belt onto the primary sheave
side.
8
Install the V-belt with printed arrow mark on
the V-belt facing in the direction shown in
the illustration.
2. Install:
8
clutch carrier nut
1
90Nm(9.0m • kgf, 65.1ft • lbf)
TIP
While holding the clutch carrier with the rotor
holding tool
2
, tighten the clutch carrier nut with
the locknut wrench
3
.
5
2
1
3
4
Содержание 2009 YW125Y
Страница 1: ...2009 MOTORCYCLE SERVICE MANUAL Model YW125Y_ 32SF819770E0 32SF819770E0 ...
Страница 200: ...ENG 5 20 THE ROCKER ARMS AND CAMSHAFT 5 Install 8stopper plate 1 8locknut 2 12Nm 1 2m kgf 8 7ft lbf T R ...
Страница 338: ...Yamaha Motor Canada Ltd 480 Gordon Baker Road Toronto ON M2H 3B4 ...