
4 - 37
ENG
2. Install:
●
Stopper lever assembly
1
To shift shaft
2
.
NOTE:
Apply the transmission oil on the stopper lever
assembly.
5PA41070
Shift shaft
1. Install:
●
Shift shaft
1
NOTE:
●
Apply transmission oil on the shift shaft.
●
When installing the shift shaft, align the stop-
per lever roller with the slot on segment.
●
When installing the shift shaft, make sure
that the torsion spring
2
is in the position as
shown.
5PA41080
5PA41090
2. Check:
●
Shift lever
1
position
Gaps
a
and
b
are not equal except in
neutral
→
Replace the shift shaft.
5PA41100
Kick shaft assembly
1. Install:
●
Kick gear
1
●
Washer
2
●
Torsion spring
3
To kick shaft
4
.
NOTE:
Make sure the stopper
a
of the torsion spring
fits into the hole
c
in the other side of the
stopper
b
of the kick shaft.
5PA41110
KICK SHAFT, SHIFT SHAFT AND PRIMARY DRIVE GEAR
Содержание 2002 YZ85/LC
Страница 61: ...GEN INFO MEMO ...
Страница 111: ...2 16 SPEC MEMO ...
Страница 455: ... ELEC MEMO ...
Страница 504: ...PRINTED IN JAPAN 2001 4 1 9 1 CR E F G PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...