![YAMADA AFC-9000S Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/yamada/afc-9000s/afc-9000s_operation-manual_3106846007.webp)
2
1-2. Operation panel
1-3. What is in the package
(See Figure 1-1 on page 1.)
Oil changer (this machine), flexible nozzle L1200, connection hose for oil circulation replacement (two), exhaust nozzle,
cleaning coupler, nozzle stand and setscrew (M6 × 35, for a nozzle stand) (two)
Operation manual
1. Use a lifter to unload the package from a truck.
2. Remove the wooden crate, and hold the grips located on both sides to unload this machine from the base.
3. Check to see if the machine is neither scratched nor damaged.
4. Check to see if all supplied parts are in the package.
5. Connect the power supply plug to the 220 V AC outlet. If the machine operates normally, the buzzer sounds and
the signal lights light.
CAUTION
-
・
When you lift this machine, hold the grips located on both sides of the main unit with two or more persons.
Do not tumble or drop this machine.