![Yale SLE 3 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/yale/sle-3/sle-3_operation-manual_3104548027.webp)
6
Error and warning messages, faults
09.2019
27
ba
-o
.4
.1
.3
-en
-2
.2
-y
6
Error and warning messages, faults
WARNING
Testing of the electrical installation may only be carried out by an
electrical qualified
person
.
Changes to the overload cut-off point or a device replacement may only be carried out by
a
qualified person
.
6.1
Operation
The detailed description of errors is to be found in the "Service instructions of the
manual".
Internal tests are carried out when the power supply is switched on. The LEDs "pwr",
"err", "I", "II", "III" light up during this test.
The
SLE 3
is ready for operation when only the LED "pwr" is still on.
Symbols
LED is off
LED flashes
LED lights up
III
II
I
err
pwr Cause
Consequence
Correction
Device is ready for operation
Содержание SLE 3
Страница 2: ...ba o 4 1 3 en 2 2 y...
Страница 4: ...4 09 2019 ba o 4 1 3 en 2 2 y 8 2 Type designation 33...
Страница 35: ...Annex 09 2019 35 ba o 4 1 3 en 2 2 y Notes...