Horizontal
1033604D-6/27
Check your work.
CONTACT POINT 1
CONTACT POINT 3
CONTACT POINT 2
Loosen knob.
Adjust claw
vertically.
Tighten
knob.
Adjust the claw horizontally.
Adjust the claw vertically.
NOTE: It may be
necessary to alternate
between step 3 and step
4 until a solid connection
is achieved.
Complete claw adjustment by
securing the black claw tightener
with the integrated assembly device.
Locate the black
claw tightener.
With the RailGrab
covers open...
Did you establish three
solid
contact points?
Note: rounded factory racks may
only require two points of contact.
Overview
Claw Set Up
Install first
set of towers
Determine
crossbar spread
Install second set
of towers
YOU
ARE
HERE
The goal is to move the claw vertically and horizontally to
fit with your factory rail. These adjustments must be made in
tandem. You must establish three solid points of contact.