background image

If yoU hAve bARs ThAT cAn be moved…

Move the bars to 30” (76cm) apart.

Load baSkeT onTo rackS.

center basket over your rack’s crossbars.

do noT ATTAch bRAcKeTs 

To unSTabLe PoInTS.

do not attach brackets at these locations.

•If you have fIxed bars:

•If your bars Move:

(SIDE vIEw)

A friend 

would make 

this easier .

Q Tower owners: 

never reposITIon The Q Towers!

TIghTen your crossbars

If you loosened TheM.

If you have “Q TowerS”

oR bARs ThAT cAnnoT move…

continue to sTeP 

 .

aTTach faIrIng To eITher end of baSkeT.

Pry open the 

SnapArounds,  

attach them 

to the LOwER 

FRONT BAR.

• Insert bolts through

washers, fairing

and Snaparounds.

• attach knobs and TIghTen.

NOTE: The fairing can fold down when 

carrying long slender loads.

Remove the machine screws from 

the ends of the Loadwarrior tubes. 

noTe

: always replace 

machine screws 

with washers (from 

loadWarrior) into same 

holes when reassembling.

You may find tapered 

screws with your 

Extension.

MACHINE 

SCREwS

TAPERED

SCREwS

do noT insert the tapered 

screws from extension into your 

Loadwarrior’s holes.

exTensIon 

UseRs:

Insert screws with 

washers into each 

of the joints and 

tighten them.

Assemble 

The baSkeT.

Отзывы: