6100002998-Rev2
2/8
LOGO
ASSEMBLY INSTRUCTIONS: AWNINGS WITH TWO CHANNELS
x2
x2
INSTALL BRACKETS ONTO AWNING
2
OPEN CLAMPS
Rotate Tightening Knob on
Bracket in an anti-clockwise
direction to open Clamp Jaws
fully.
1
x2
x2
If Using M6 Hardware
Insert two M6 Bolts into each
end of the upper channel.
Attach a Bracket to each pair
of Bolts ensuring the rib of the
Bracket sits within the bottom
channel and Bolts sit through
the outermost Bracket holes.
Thread an M6 Washer and
M6 Nut onto each Bolt before
tightening loosely by hand.
x2
x2
x4
x4
The hardware used to secure the Brackets to the awning will depend on the width of the
upper channel.
In most cases, the M6 hardware provided in the kit will be sufficient. However, wider
channels may require the use of the M8 Nuts, Bolts and Washers supplied.
Be sure awning is oriented
correctly with the logo
right side up in relation to
the clamps.