background image

FCC ID: K66VX-2500V

 Alignment

Vertex Standard Co., Ltd.

1/6

VX-2500V Alignment

Introduction

The VX-2500V is carefully aligned at the factory for the specified performance across the
frequency range specified for each version. Realignment should therefore not be necessary
except in the event of a component failure, or altering version type. All component
replacement and service should be performed only by an authorized Vertex Standard
representative,or the warranty policy may be void.

The following procedures cover the sometimes critical and tedious adjustments that are not
normally required once the transceiver has left the factory. However, if damage occurs and
some parts subsequently are placed, realignment may be required. If a sudden problem
occurs during normal operation, it is likely due to component failure; realignment should not
be done until after the faulty component has been replaced.

We recommend that servicing be performed only by authorized Vertex Standard service
technicians who are experienced with the circuitry and fully equipped for repair and
alignment. Therefore, if a fault is suspected, contact the dealer from whom the transceiver
was purchased for instructions regarding repair. Authorized Vertex Standard service
technicians realign all circuits and make complete performance checks to ensure compliance
with factory specifications after replacing any faulty components.

Those who do undertake any of the following alignments are cautioned to proceed at their
own risk. Problems caused by unauthorized attempts at realignment are not covered by the
warranty policy. Also, Vertex Standard reserves the right to change circuits and alignment
procedures in the interest of improved performance, without notifying owners.

Under no circumstances should any alignment be attempted unless the normal function and
operation of the transceiver are clearly understood, the cause of the malfunction has been
clearly pinpointed and any faulty components replaced, and realignment determined to be
absolutely necessary.

The following test equipment (and thorough familiarity with its correct use) is necessary for
complete realignment. Correction of problems caused by misalignment resulting from use of
improper test equipment is not covered under the warranty policy. While most steps do not
require all of the equipment listed, the interactions of some adjustments may require that
more complex adjustments be performed afterwards.

Do not attempt to perform only a single step unless it is clearly isolated electrically from all
other steps. Have all test equipment ready before beginning, and follow all of the steps in a
section in the order presented.

Required Test Equipment

ˆ

 

RF Signal Generator with calibrated output level at 1000MHz

ˆ

 

Deviation Meter (linear detector)

ˆ

 

In-line Wattmeter with 5% accuracy at 1000MHz

ˆ

 

50-

 RF Dummy Load with power rating 100W at 1000MHz

ˆ

 

4-

 AF Dummy Load 

ˆ

 

Regulated DC Power Supply (standard 13.8V DC, 15A)

Содержание VX-2500V

Страница 1: ...lacing any faulty components Those who do undertake any of the following alignments are cautioned to proceed at their own risk Problems caused by unauthorized attempts at realignment are not covered by the warranty policy Also Vertex Standard reserves the right to change circuits and alignment procedures in the interest of improved performance without notifying owners Under no circumstances should...

Страница 2: ...be the same as that of the transceiver and test equipment and that this temperature be held constant between 20 and 30 C 68 86 F When the transceiver is brought into the shop from hot or cold air it should be allowed time to come to room temperature before alignment Whenever possible alignments should be made with oscillator shields and circuit boards firmly affixed in place Also the test equipmen...

Страница 3: ...lignment mode normal operation is suspended Use the alignment tool program running on PC PLL VCV Connect the positive lead of the DC voltmeter to the test point TP1007 VCV on the RF Unit as indicated in the figure and the negative lead to chassis ground Set the transceiver to the high band edge frequency channel then adjust coil L1017 on the Unit for 4 25V on the voltmeter Key the transmitter and ...

Страница 4: ...ct the Channel 1 in alignment range Press the Space key on the keyboard to activate the transmitter Press the UP DWN key as need to set the power output to the following specification as indicated on the external wattmeter Tx Power High 25 W 0 5W When the 25Watt level is attained press Enter to lock in the new data 1 Tx Power Low This parameter is used to align TX Low power 5W Press Enter on 1 Tx ...

Страница 5: ... on 4 CTCSS Deviation to align CTCSS Deviation Select the Channel 1 in alignment range Press the Space on the keyboard to activate the transmitter and injects a CTCSS test tone Press the UP DWN key as need to set the CTCSS Deviation Wide to the following specification Press Enter to lock in the new data Select the Channel 2 and set the CTCSS Deviation Narrow same as Channel 1 CTCSS Deviation Wide ...

Страница 6: ...on will increase around 20 based on the above alignment as follows Actual LTR Deviation Wide 1 00 kHz Actual LTR Deviation Narrow 0 70 kHz 1 Common RX 0 Tight NSQL This parameter is used to align the noise level in squelch Tight It adjusts this alignment RX Tuning after ending Select the MID frequency channel in alignment range Set the SG output level to 2 5dBµV and obey the message 1 Threshold NS...

Отзывы: