![YABE 110+PTO Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/yabe/110-pto/110-pto_operating-instructions-manual_892544015.webp)
15
110/120
Fig. 4
ONLY FOR THREE-PHASE MODELS
Before installation check the rotation direction
of the electric motor.
To do this it is necessary to:
1) Carry out electric connection with the
engine plug (1 Fig. 4). For supply voltage
see “Transmission” in table 1.4 TECHNICAL
FEATURES, according to the wood-cutter
model.
2) Power the motor for one or two seconds
with the green push button located on top
110HYD
120T
120+PTO
120T+PTO
120HYD
Idraulico
400/3,0
Cardano
400 / 3,0
Idraulico
10
13
13
13
13
55-70-110
55-70-110
55-70-110
55-70-110
55-70-110
2-7
8
2-7-8
14
14
14
300
300
300
305
300
300
300
300
300
300
78.0
78.0
78.0
78.0
78.0
97.3
97.3
97.3
97.3
97.3
1600
1600
1600
1600
1600
1100
1100
1100
1100
1100
730
730
730
730
730
Содержание 110+PTO
Страница 1: ...110 120 ITALIANO 2 ENGLISH 12 FRAN AISE 22 DEUTSCH 32 ESPA OL 42...
Страница 52: ...110 120...