MIQ/CHV PLUS
Installation
13
ba75539d03
03/2018
Connecting the
control line to the
terminal strip
Fig. 3-1
Clamping termination for the valve control line
1
Open the module.
2
Screw the cable gland (pos. 1 in Fig. 3-1) with the sealing ring (pos. 2)
into the left connection opening.
3
Loosen the coupling ring (pos. 3 in Fig. 3-1).
4
Feed the valve control line through the left cable gland in the module
housing.
5
Connect the wires of the valve control line (pos. 5 in Fig. 3-1) to the
clamping termination for the valve control line. While doing so, pay
attention to the specifications on the label located under the terminal
strip.
6
Tighten the coupling ring (pos. 3 in Fig. 3-1).
X6
X5
X4
SENSORNET 2
RED
RO
T
SHIELD
SCHIRM
GREEN
GRÜN
X3
X2
X1
SENSORNET 1
RED
RO
T
SHIELD
SCHIRM
GREEN
GRÜN
ON
EIN
OFF
AUS
SN
TERMINA
TO
R
Valve
X7
X8
Valve
1
3
2
4
5