TROUBLESHOOTING

Replace the regulator or pilot(s) when parts no longer
operate properly.  A new regulator is more economical
than replacing individual parts, and will provide greater
reliability.

General Series 2000 Regulator System
Troubleshooting Guidelines 

Dead End Service

The seat leakage rate for metal single seated valves is
.01% of rated flow, which is the industry standard.  In
applications where .01% flow will cause pressure or tem-
perature override, seat lapping may be required.  (See
"Seat Lapping Procedure", page 14.)

Lifts in the Return Line on Heat Exchanger
Applications

An elevated return line on a heat exchanger requires
steam pressure to lift condensate.  Condensate cannot
drain from the heat exchanger shell until the internal pres-
sure is sufficient to lift the condensate.  The steam pres-
sure required to lift the condensate remains in the heat
exchanger shell.  This can then cause a temperature
overshoot and wide swings in temperature.

Steam Traps Undersized

Undersized steam traps can cause condensate to back up
in a heat exchanger shell. Backed up condensate covers
some of the tubes, reducing the heat transfer surface.  If
condensate backs up it may appear that the regulator is
undersized.  

When a temperature regulator is installed in

the steam supply, size the steam trap based on 1/2 psig
pressure differential.

Failure to Install System Recirculation Pumps

A system without a recirculation pump will have wide tem-
perature fluctuations during start-up.  The regulator will
also overshoot the temperature when system steam flow
stops, trapping steam in the heat exchanger shell due to
the response time required to close the regulator.

Low or Improper Outlet Pressure
Cause: 

Low inlet pressure

Solution:  Correct supply pressure from the boiler.

Fully open supply valve.
Check for upstream blockage.

Cause: 

The regulator is not properly adjusted.

Solution:  Readjust the pilot to desired operating pressure.

Cause: 

Feedback control line plugged.

Solution:  Remove and clean.

Cause: 

Bleed orifice missing or worn.

Solution:  Replace with new bleed orifice. 

Cause: 

Main valve undersized.

Solution:  Check valve capacity against system load.  

Replace with correct size valve.

Cause: 

Strainer plugged.

Solution:  Blow down strainer screen or remove and 

clean screen.

Delivery Pressure High or Overrides
Cause: 

Bypass valve is open.

Solution:  Close bypass valve.

Cause: 

The regulator is not properly adjusted.

Solution:  Readjust the pilot to desired operating 

pressure.

Cause: 

Bleed orifice plugged.

Solution:  Clean or replace with new bleed orifice. 

Cause: 

Dirt under the seat of main valve.

Solution:  Remove top cover plate and clean the seat 

surfaces.

Cause: 

Pilot valve malfunction.

Solution:  Refer to pilot valve test and repair procedures.

Cause: 

Main valve oversized.

Solution:  Check valve capacity against system load.  

Replace with correct size valve.

Delivery Pressure or Temperature Erratic
Cause: 

Pressure momentarily overshoots and then 
recedes to set pressure.

Solution:  Valve is not responding fast enough to react to 

the system.  Drilling the bleed orifice out to 
3/32" can increase the valve closing response 
time.  

(Do not drill bleed orifice if a temperature 

pilot is used, as temperature accuracy will be 
decreased.  Do not drill bleed orifice if differen-
tial pressure across the main valve is less than 
40 psi as the valve may not fully open).

Cause: 

Sensing line improperly located in the system. 

Solution:  Relocate the sensing line to stable pressure 

area.

Cause: 

Temperature bulb improperly located.

Solution:  Relocate sensing bulb to make sure it is fully 

inserted into the system flow path.

12

Содержание Bell & Gossett Hoffman Specialty 2000 Series

Страница 1: ...INSTRUCTION MANUAL HS 601I 510549...

Страница 2: ...lots only The steam system relief valve opening set point pressure is based on the supply steam inlet pressure to the regulator and must be set as follows 12 Locate temperature regulators close to the...

Страница 3: ...ee siphon loop tube petcock and pressure gauge 12 On NPT sized regulator valves install a pipe union M to allow regulator removal for service or replacement 13 Use compressed air or steam to clean pip...

Страница 4: ...d directly into the heat exchanger shell 22 Install pressure relief valve V in the downstream piping as required by codes 23 Install a tee fitting W for pressure feedback line 24 Install a siphon loop...

Страница 5: ...254 5 7 145 Combination 2 1 2 65 10 6 269 12 8 325 10 0 254 5 9 150 Pilots 3 80 11 2 284 13 1 333 10 0 254 6 4 162 4 100 13 0 330 13 9 353 10 0 254 7 9 200 6 150 16 6 422 14 9 378 10 0 254 9 5 241 1...

Страница 6: ...n 6 Install the L fitting from the hardware kit in the tapping at the center of the main valve diaphragm cover Note For steps 7 and 8 trim the length of the copper tubing as required see Tubing Length...

Страница 7: ...t 1 When only a temperature pilot is used the outlet tapping port must be reduced Use the 1 8 x 1 4 NPT bushing from the hardware kit in the 1 4 NPT outlet 2 Insert the sensing bulb so the full length...

Страница 8: ...from the tank or piping without draining the system When using a dry well coat the bulb with high temperature grease or heat transfer compound to aid heat transfer Make sure that bulb and dry well ar...

Страница 9: ...ediate pressures can be interpolated from the chart PNT Air Signal Maximum Steam Pressure from Main Valve Outlet Pressure AP 1A Pressure Pilot AP 4A Pressure Pilot psig Bar psig Bar psig Bar 9 0 62 0...

Страница 10: ...radually compress adjusting spring by tightening adjusting nuts equally until the pilot valve opens Air Adjust Air PRV to allow pressure to build slightly until the air pilot valve opens Temperature I...

Страница 11: ...making the adjustment 4 Observe the temperature while the system is running 5 Adjust the sleeve until the desired temperature is reached 6 Tighten the dial set screw without turning the adjusting sle...

Страница 12: ...e Cause Low inlet pressure Solution Correct supply pressure from the boiler Fully open supply valve Check for upstream blockage Cause The regulator is not properly adjusted Solution Readjust the pilot...

Страница 13: ...e air line slowly increase the air pressure on the main valve diaphragms from 0 psig to 30 psig 0 to 2 1 bar Slowly decrease the pressure back to 0 psig 0 bar Repeat this step several times 4 Check fo...

Страница 14: ...Valve Seat Lapping Procedures below 9 To continue disassembly Replace plug and stem nut onto stem to prevent damage to diaphragm when air pressure is released Do not fully tighten nut Relieve air pres...

Страница 15: ...necessary or replace components to stop any leaks 15 Return the main valve to service Main Valve Diaphragm Replacement A leak in the diaphragm will not allow full steam pressure to build up under the...

Страница 16: ...t 7 Connect a 30 psig air supply to the 1 4 NPT pilot INLET port 8 Test for seat and disc leakage Open shut off valve from SIGNAL LINE port Apply air pressure at the INLET port Check for leakage from...

Страница 17: ...ding the stem Spring Pilot Seat Lapping Operations Lap sparingly using 500 grit lapping compound and light pressure Heavy grinding may cause galling wide sealing surfaces and a grooved disc all of whi...

Страница 18: ...urns 3 Back off air loading pressure 4 If used in conjunction with a temperature pilot set temperature setting higher than the bulb temperature 5 Slightly open the shut off valve in the steam supply t...

Страница 19: ...If air is leaking replace the diaphragms AP 4A With a 30 psig air supply to the FEEDBACK tapping the SIGNAL line and IN tapings plugged check for air leakage from the vent hole of the pilot If air is...

Страница 20: ...ble well is provided Failure to follow this procedure may result in serious burns CAUTION Temperature pilot bulb will be inserted in the heated fluid Before immersing check compatibility of copper bul...

Страница 21: ...ecessary 4 Apply non hardening sealant to bottom plug 4 threads Reassemble pilot 5 Retest pilot y y y yy y yy yy yy yyy y y y yy y y y y y y yy yy yy yy yy 150 F 70 C 60 C 50 C 125 F BELLOWS HOUSING B...

Страница 22: ...achieve the desired system temperature 3 Allow system temperature to stabilize at the desired set point temperature and normal load conditions Securely tighten the adjustment knob set screw 4 Rotate...

Страница 23: ...lect alteration accident or physical damage c used in a manner contrary to Seller s instructions for installation operation and maintenance d damaged from ordinary wear and tear corrosion or chemical...

Страница 24: ...ration and maintenance d damaged from ordinary wear and tear corrosion or chemical attack e damaged due to abnormal conditions vibration failure to properly prime or operation without flow f damaged d...

Отзывы: