If multiple anodes were weighed, then use the anode which has lost the most weight for
this calculation.
4. Calculate future replacement intervals so that they occur when the selected fraction of
zinc is remaining.
5.3 Start the pump
CAUTION: Crush Hazard
The starting jerk can be powerful. Make sure nobody is close to the unit when it is started.
CAUTION: Thermal Hazard
The surfaces or parts of the unit may become hot during operation. Allow surfaces to cool
before starting work, or wear heat-protective clothing.
NOTICE:
Make sure that the rotation of the impeller is correct. For more information, see Check the
impeller rotation.
1. Remove the fuses or open the circuit breaker, and check that the impeller can rotate
freely.
WARNING: Crush Hazard
Never put your hand into the pump housing.
2. Conduct insulation test phase to ground. To pass, the value must exceed 5 megaohms.
3. Check that the monitoring equipment works.
4. Start the pump.
5 Operation
60
P7030, P7035, P7040 Installation, Operation, and Maintenance Manual
Содержание 7030.090
Страница 1: ...Installation Operation and Maintenance Manual 882901_15 0 P7030 P7035 P7040...
Страница 2: ......