![Xylem 7030.090 Скачать руководство пользователя страница 61](http://html1.mh-extra.com/html/xylem/7030-090/7030-090_installation-operation-and-maintenance-manual_892061061.webp)
5 Operation
5.1 Precautions
Before taking the unit into operation, check the following:
• All recommended safety devices are installed.
• The cable and cable entry have not been damaged.
• All debris and waste material has been removed.
NOTICE:
Never operate the pump with the discharge line blocked, or the discharge valve closed.
WARNING: Crush Hazard
Risk of automatic restart.
Distance to wet areas
WARNING: Electrical Hazard
Risk of electrical shock or burn. You must connect an additional ground- (earth-) fault
protection device to the grounded (earthed) connectors if persons are likely to come into
contact with liquids that are also in contact with the pump or pumped liquid.
CAUTION: Electrical Hazard
Risk of electrical shock or burn. The equipment manufacturer has not evaluated this unit for
use in swimming pools. If used in connection with swimming pools then special safety
regulations apply.
Noise level
NOTICE:
The sound power level of the product is lower than 70 dB(A). However, in some installations
the resulting sound pressure level may exceed 70 dB(A) at certain operating points on the
performance curve. Make sure that you understand the noise level requirements in the
environment where the product is installed. Failure to do so may result in hearing loss or
violation of local laws.
5.2 Estimate zinc anode replacement intervals
The mass and surface area of the zinc anodes are designed to protect the pump surface for
1 year in sea water with an average temperature of 20°C (68°F). Shorter inspection intervals
and anode replacement can be required, depending upon the water temperature and the
chemical composition as well as the presence of other metals in the vicinity of the pump.
The rate of zinc consumption, and the appropriate inspection intervals, can be estimated by
measuring how much zinc is consumed during the first two months following installation.
Anodes are replaced when the anode mass is reduced to a selected fraction of its initial
mass. The recommended interval for the selection fraction is 0.25–0.50 (25–50%).
1. Remove, weigh, and reinstall one or more of the exterior zinc anodes before starting up
the pump.
2. After two months, remove and weigh the same zinc anode or anodes again.
3. Divide the lapsed time in days (between steps 1 and 2) by the anode weight loss in
grams to get the calculated anode consumption rate (days/gram).
5 Operation
P7030, P7035, P7040 Installation, Operation, and Maintenance Manual
59
Содержание 7030.090
Страница 1: ...Installation Operation and Maintenance Manual 882901_15 0 P7030 P7035 P7040...
Страница 2: ......