![Xylem 201570 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/xylem/201570/201570_operating-manual_891743010.webp)
Maintenance, cleaning, replacement
DurOx 325
10
ba25400e04
10/2020
Carefully shake off the drops
of water.
Fill a new membrane cap with
ELY/G electrolyte solution.
Remove any air bubbles by
carefully tapping the
membrane head. Additionally,
you can prevent air bubbles
by throwing the first filling
away and refilling the
membrane cap.
Thoroughly rinse the sensor
head with electrolyte solution.
Hold the sensor inclined and
screw on the membrane head
fingertight using a paper
towel. Excess electrolyte
solution is forced out of the
ventilation area.
Check the filling:
Inspect the face surface. No
air bubbles may be present
within the dashed circle. Air
bubbles outside this area do
not interfere.
Note
For measurements under high pressure the filling must be
completely free of air bubbles.
Readiness to measure
After approx. 30 to 50 minutes, the sensor is ready for operation.
Subsequently calibrate the sensor.
Note
If you want to measure very low oxygen concentrations (< 0.5 %
saturation), we recommend to let the sensor rest overnight and
then calibrate it.
EL
Y/G
EL
Y/G
Ventilation area
points upwards
3 mm
Содержание 201570
Страница 1: ...OPERATING MANUAL ba25400e04 10 2020 DurOx 325 DISSOLVED OXYGEN SENSOR OPERATING MANUAL...
Страница 2: ...DurOx 325 2 ba25400e04 10 2020 Copyright 2020 Xylem Analytics Germany GmbH Printed in Germany...
Страница 4: ...Contents DurOx 325 4 ba25400e04 10 2020...
Страница 18: ...Wear parts and accessories DurOx 325 18 ba25400e04 10 2020...
Страница 19: ......