
75
E-mail: [email protected]
Website: www.Xtramus.com
XTRAMUS TECHNOLOGIES
®
6. Controlling Tests with NuPAD
NuPAD
is an assistant extension keypad, especially designed for running
tests at mass production line.
With all test parameters set and stored in NuStreams-P6GW,
NuPAD
allows users to perform tests without changing pre-set parameters.
6.1. NuPAD Functions Overview
Description
A Connection
Port
Connecting NuPAD with NuStreams-P6GW’s
Console Port
.
B LCD
Screen
Displaying system information, status, and test results.
C Control
Buttons
¾
|| Pause:
Press this button to pause the current running test.
Press this button again to resume the test.
¾
■
Stop:
Press this button to stop the current running test.
¾
►
Run:
Press this button to start test.
D/E System
LEDs
¾
Sys/Link/Alarm:
Showing NuPAD running status.
¾
Power:
When NuPAD is connected to NuStreams-P6GW’s
Console Port
, the Green Power LED will be ON.
¾
Pass/Fail:
If the test passed, the Pass/Fail
Green LED
will be
ON
; if the test failed, the Pass/Fail
Amber LED
will be
ON
.
¾
Step 1~4:
Showing the progress of the test.
Содержание NuStreams-P6GW
Страница 1: ...NuStreams P6GW User s Manual USM Ver 1 0 ...