Commissioning
Commissioning follows installation and power-up of the detector and involves the following steps:
1. Use Xtralis VSC to:
l
Accept factory default configurations.
l
Check that the fire-alarm threshold setting is appropriate to the pre-engineered design used.
l
Select appropriate air flow threshold setting.
l
Normalize the air flow.
2. Functionally test the detector by introducing smoke into the last hole.
3. Record and confirm the transport time is less than 90 seconds.
Содержание XCC-010
Страница 1: ...Xtralis Class C XCC Product Guide XCC 010 XCC 01000 MRN May 2011 D N 14159_07 P N 29185 ...
Страница 2: ......
Страница 6: ...XCC Product Guide Xtralis Pty Ltd iv www xtralis com This page is intentionally left blank ...
Страница 8: ...XCC Product Guide Xtralis Pty Ltd 2 www xtralis com This page is intentionally left blank ...
Страница 14: ...XCC Product Guide Xtralis Pty Ltd 8 www xtralis com This page is intentionally left blank ...
Страница 24: ...XCC Product Guide Xtralis Pty Ltd 18 www xtralis com This page is intentionally left blank ...
Страница 26: ...XCC Product Guide Xtralis Pty Ltd 20 www xtralis com This page is intentionally left blank ...
Страница 33: ...Xtralis Pty Ltd XCC Product Guide www xtralis com 27 Figure 7 2 XCC detector dimensions rear view ...