SB120 Recumbent Bike
11
Tension and Pulse Wires
3
1. Remove the pre-installed 4
Allen Screws (No. 17)
& 4
Arc Washers (No. 33)
from
Front Post (No. 02)
and connect the
Upper Sensor Wire (No. 10)
with the
Lower
Sensor Wire (No. 11)
(see fig. 3.2).
2. Connect
Upper Pulse Sensor Wire (No. 12)
with
Lower Pulse Sensor Wire (No. 13)
(see fig. 3.3).
3. Insert the
Front Post (No. 02)
into the
Main Frame (No. 01)
and secure with 4
Allen
Bolts (No. 17)
and 4
Curved Washers (No. 33)
.
Allen Key
73
72
Wrench
10
02
12
13
17
33
10
11
35
28
29
01
12
13
11
Fig. 3.2
51
Fig. 3.3