XtendLan PEDOMEOIR48023SD Скачать руководство пользователя страница 14

13 

001101 

29 

011101 

45 

101101 

61 

111101 

14 

001110 

30 

011110 

46 

101110 

62 

111110 

15 

001111 

31 

011111 

47 

101111 

63 

111111 

16 

010000 

32 

100000 

48 

110000 

 

 

 

Protocol KRE-301 for KODICOM card hard disk video recorder, protocol 

PELCO-D and RM110 for Shanghai Chenova hard disk video recorder all adopt the 
hexadecimal system, which is different from other protocols adopting decimal system, 
so the address should be converted into decimal system. For details, please see coding 
switches in Table 3. 

 

Tab le 3

Correspondence of 

Hexadecimal 

Address and Coding Switches

 

No 

654321 

No 

654321 

No 

654321 

No 

654321 

   1 

000001 

000101 

001001 

13 

010011 

000010 

000110 

10 

010000 

14 

010100 

000011 

000111 

11 

010001 

15 

010101 

000100 

001000 

12 

010010 

16 

010110 

Please setup coding switches according to Table 2 or Table 3 as per the address you 
defined by yourself. 

 

2.

 

Communication Baud Rate Setup 

 

As shown in  picture 11, DIP-7 and DIP-8 of the 8-button coding switches are 

used to setup Baud rate of communication and 4 different Baud rate can be selected 
(1200BPS/2400BPS/4800BPS/ 9600BPS). The state “ON” of each bit means“1”, 
while”OFF”means”0”. Table 4  shows states of correspondence of Baud rate and 
coding Switches.

 

 

Table 4

Correspondence of Baud Rate and Coding Switches 

Coding 
switches

 

1200 bps 

2400 bps 

4800 bps 

9600 bps 

No. 7

 

OFF 

ON 

OFF 

ON 

No. 8

 

OFF 

OFF 

ON 

ON 

 

Please setup the  coding switches  according to Table 4  based on the communication 
baud rate applied for constant speed ball device. 

 

3.

 

Protocol Setup   

 

  As indicated in the picture 11, DIP-1 to DIP-4 of the 6-button coding switches 

are used to setup protocol of the constant speed ball. The built-in Decoding PCB 
penal provides protocols as listed in Table 5. Other protocols can also be written-in as 
the user requires. 

Содержание PEDOMEOIR48023SD

Страница 1: ...PEDOMEOIR48023SD Smart Constant Speed Dome Camera User Manual...

Страница 2: ...breakdown arising from the dismantling or repairing of the unit without the company s authorization 2 Damage or breakdown arising from the client arranged transportation loading or unloading of the u...

Страница 3: ...tomer s needs The Baud rate is also adjustable 10 The unit adopts DC12V power supply and separates from it the components that produce heat in the process of transformation which prolongs the durabili...

Страница 4: ...ve Humidity below 90 RH 1 4 Styles of Installation and Ancillary Components Table 1 Styles of Installation and Ancillary Components of Constant Speed Ball Table 1 Styles of Installation and Ancillary...

Страница 5: ...Installation Procedures 2 1 Outer shape and installation size Outer shape and installation size 2 1 1 2 Picture 1 Outer shape and size of wall mount style Picture 2 Outer shape and size of pendant mou...

Страница 6: ...coding panel Camera power supply 12VDC GND Lens Zoom ZOOM Lens Focus FOCUS Lens Iris IRIS Lens Controlling public ground COM 3 Connecting Video Cable Connect BNC video outlet with the video output out...

Страница 7: ...ll Installation of bracket of outer door Constant Speed Ball of wall mount type Picture 5 Size of bracket of outer door Constant Speed Ball of wall mount type Select the position for installation of C...

Страница 8: ...pencil then install the fixing tray in the ceiling with expanding bolts not provided Please don t forget to push the connecting ports end of the power video and controlling integrated cable through t...

Страница 9: ...to be a hemisphere having an elegant look and good concealment The hemisphere style installation applies to solid locations of the ceiling First select the desired location mark the outline of the up...

Страница 10: ...er supply of Decoding PCB penal Camera lens controlling cable Camera lens control power Decoding PCB penal camera Provided with the integrated camera including power cables 2 Connection of temperature...

Страница 11: ...uilt in Decoding PCB penal the control of the dome and camera lens is realized by setting up address protocol and baud rate through the decoding PCB penal 1 Address Setup As shown in the picture 10 an...

Страница 12: ...amera power GND Lens common terminal Iris Focus Zoom 485 input Video outlet Power supply input 1 6 Address select switch 7 8 Baud rate select switch Key for left position setup Key for dome speed adju...

Страница 13: ...7 100101 53 110101 6 000110 22 010110 38 100110 54 110110 7 000111 23 010111 39 100111 55 110111 8 001000 24 011000 40 101000 56 111000 9 001001 25 011001 41 101001 57 111001 10 001010 26 011010 42 10...

Страница 14: ...ording to Table 2 or Table 3 as per the address you defined by yourself 2 Communication Baud Rate Setup As shown in picture 11 DIP 7 and DIP 8 of the 8 button coding switches are used to setup Baud ra...

Страница 15: ...ommunication protocols with hard disk video recorder CNEUOL embedded Enterasys embedding DM embedding Hikvision embedding KCL YAAN SAMSUNG KIDICOM SX For information of hard disk video recorder protoc...

Страница 16: ...Speed Ball Code Name of the function Definition for the keyboard operation Code Name of the function Definition for the keyboard operation 160 Begin with left right limiting position setup 140 Begin w...

Страница 17: ...o action b The constant speed ball is in the state of pan auto touring If the constant speed ball is in the state of pan auto touring the tour should be stopped through the controlling device to avoid...

Страница 18: ...ns After controlling pan tilt of the constant speed ball to desired position through the keyboard enter the number representing the preset position and LED displays the entered preset position number...

Страница 19: ...position 1 to setup the first tour position Enter number 1 and press the PREVIEW key 3 Preview preset position 2 to setup the second tour position Enter number 2 and press the PREVIEW key 4 Preview p...

Страница 20: ...camera s master board The operation requires the co operation of two people A Once the dome is installed well and power is on the constant speed ball starts a self check After the self check the posi...

Страница 21: ...ired position press either S2 or S1 and then release it and the dome will stop moving Finally press the key S2 for about 2 seconds till the green indicator glistens once The glistening means the setup...

Страница 22: ...he Default Position Move the constant speed ball to a key monitoring area through the controlling keyboard and enter number 164 124 from the keyboard and press the PREVIEW key and the setup is success...

Страница 23: ...ut control Wrong setup of address code baud rate of the ball set Reset address code and baud rate of the ball set Wrong protocol Correct opposite connection or disconnection of RS458 cable Check conne...

Страница 24: ...485 signal is weakening the driving of 485 convertor is not enough Replace the convertor...

Отзывы: