https://www.XPOtool.com
Item 61909
Page 5
The Tool Experts
05 2022-1
5. Position the main stand on the floor in the desired position.
Leave a working area of at least 914
mm on all sides. Mark the
drill holes through the base holes and drill four 12.7
mm diameter
holes.
6. Insert 76.2
mm (3″) concrete anchors into the holes and tighten
the anchor nuts.