Each XOLTA outdoor BESS has a battery protection unit (BPU). Figure 2.2 is an illustration of the BPU  

 

consisting of a communication section and a power section.

 

 

The site controller is installed in the BPU and is connected to the XOLTA Cloud using the Ethernet port shown  

 

in Figure 2.2. The Ethernet port ensures communcation between neighboring racks if operating in unison. 

 

The site controller communicates with Lithium Balance’s n-BMSs via the CAN bus.

 

The DB9 Modbus port is used for communication with peripherals (e.g. energy meters).

 

 

The RJ45 port marked SPI is used for communication between the n-BMS MCU and the n-BMS CMUs (which  

 

are located in battery packs). An additional DB15 plug is used for activation of the thermal management  

 

system, sensing outdoor air temperature, LED diodes control and communication with the humidity sensor- 

 

 

The Modbus TCP port is used for communication with the power conditioning unit (PCS) and communication  

 

with neighboring racks if operating in unison.

 

The BPU is powered by single phase 230V AC and is protected by a 1.5A fuse located in the power entry connector.

 

2.3  System safety

 

 

2.3.1  Safety measures

 

   

The XOLTA outdoor BESS is protected by Lithium Balance’s state of the art n-BMS. The system 

 

   

monitors essential parameters of the battery system (cell voltage, current, temperature) to 

 

   

ensure safe operation. The n-BMS also monitors the battery main parameters, e.g. State of Charge  

 

   

(SoC) and performs battery cell balancing to ensure maximal energy utilization and performance.

 

 

   

The XOLTA outdoor BESS is equipped with a battery protection unit (BPU) which protects the  

 

   

battery and the inverter from conditions which can be detrimental to the BESS. It includes redundant  

 

   

relays controlled by the n-BMS and redundant fast battery fuses.

 

   

In addition, in order to assure system longevity and safe operation (maintaining correct operating  

 

   

temperatures), each of the XOLTA outdoor BESS battery packs is equipped with 12 temperature 

 

   

sensors (two sensors per battery module). These give a total of 96 temperature sensors per battery 

 

   

rack. This number of temperature sensors allows for quick detection of local temperature gradients  

 

   

and thus ensures system safety and equal cell performance during the system lifetime. Furthermore,  

 

   

temperature sensors are located on all battery safety-related PCBs

 

   

The thermal performance of the XOLTA outdoor BESS is also monitored by the site controller and 

 

   

allows for power/current derating whenever the cell temperature or the ambient temperature is  

 

   

outside a strictly determined range. The site controller also allows for converter error handling and  

 

   

automatic connection/disconnection of battery racks.

 

     

 

NTC, LED,

thermal 

management 

BAT-

BAT+

CAN

Modbus RTU

Power

entry port

SPI

INV+

INV-

Ethernet

Modbus TCP

Содержание BAT-79

Страница 1: ...Advanced energy storage system for renewable energy and grid support applications BAT 79 USER MANUAL XOLTA OUTDOOR BATTERY ENERGY STORAGE SYSTEM 2021 by XOLTA...

Страница 2: ...y measures 10 2 3 2 Internal electrical scheme of the XOLTA outdoor BESS 11 2 4 Key specifications 12 3 XOLTA Battery Energy Storage System 3 1 Delivery inspection 12 3 2 Location requirements 13 3 3...

Страница 3: ...performed by XOLTA certified installers In consequence XOLTA provides no liability for property damage or injury caused by system modification or repairs performed by unqualified personnel or failure...

Страница 4: ...ny part of the product For long term storage longer than 1 month the product should be charged to 40 SoC and then disconnected from the grid Observe warranty conditions The product must be disposed of...

Страница 5: ...ardous fumes such as carbon dioxide carbon monoxide and hydrocarbons are emitted during battery fires ACTION Disconnect the power from the battery system if possible without getting too close to the b...

Страница 6: ...s correct and up to date However we assume no responsibility for damage to persons and property arising as a result of following recommendations and or procedures described in this manual Furthermore...

Страница 7: ...llation The product covered has been improperly altered or otherwise tampered with by the Purchaser or any third party An overvoltage has occurred in the power grid to which the product covered is con...

Страница 8: ...iding up to 1MW and 2 5MWh MULTIPURPOSE The system is designed for various applications from the integration of renewable energy e g increasing renewable self consumption up to various grid support ap...

Страница 9: ...ce s n BMS Figure 2 1 Illustration of the XOLTA outdoor BESS hardware components Conv Conv Modbus TCP L N PE 3L PE Ethernet RJ45 Ethernet RJ45 PCS Conv Conv PCS L N PE 3L PE BMS Low BMS High BMS Low B...

Страница 10: ...ors essential parameters of the battery system cell voltage current temperature to ensure safe operation The n BMS also monitors the battery main parameters e g State of Charge SoC and performs batter...

Страница 11: ...he following main components one fast DC fuse located in each battery pack two fast DC fuses located in the BPU two DC relays controlled by the n BMS 2 relays per BPU one 1 5A AC relay for protection...

Страница 12: ...permanently fixed to the ground Moving the assembled battery racks is strictly prohibited as this can damage the rack structure or the battery packs All XOLTA outdoor BESS racks should be placed vert...

Страница 13: ...al requirements The XOLTA outdoor BESS has been designed for connection to low voltage three phase 400V AC 50Hz electrical grids However the system can also be connected to grids with other voltage le...

Страница 14: ...schematics in Fig 3 3 depict a typical installation of the XOLTA outdoor BESS unit rack without solar panels Figure 3 3 Typical XOLTA outdoor BESS installation without solar panels Cloud L2 L1 L3 N P...

Страница 15: ...phases entering from the main grid meter IMPORTANT The grid feeding monitoring relay must be installed to take measurements before any con sumption i e right after the main utility meter A diagram of...

Страница 16: ...re located at the bottom of the rack Remove all five screws holding the lower front plate to access the unit terminal connections Fig 3 7 Figure 3 6 Illustration of the five screws holding the lower f...

Страница 17: ...wer Voltage specification PE N AC NULL L 240 VAC Prefuse rating Prefuse Min 2 5 A Conductor cross section 1 5mm2 1 5mm2 1 5mm2 TERMINAL4 TERMINAL5 TERMINAL6 TERMINAL7 Inverter PE Inverter power L1 Inv...

Страница 18: ...the operational state can be monitored by means of multicolored LED indicators that are located at the top The color codes of the LED indicators provide information about current operational state of...

Страница 19: ...ing modes in order to fit different users needs 4 1 1 Maximizing solar self consumption Maximizing self consumption mode is the default operational mode of the XOLTA outdoor BESS It is designed to max...

Страница 20: ...lues The limitation of P setpoints is constrained by the maximum apparent input output power of the inverter and the local grid capacity Q setpoints are limited by the power factor and the P measureme...

Страница 21: ...cription of the states and transitional procedures is provided in sections 4 2 1 and 4 2 2 4 2 1 SC States 4 2 1 1 Sleep state The system is idling it is only monitoring and transmitting battery vital...

Страница 22: ...tate 4 2 1 3 Error state If a fault is detected the system will immediately switch to the error state A series of actions will then occur Immediate shutdown of inverter DC and AC contactors open BMS i...

Страница 23: ...tup Accessible from sleep state and transitions the system to the run state During this sequence the following occurs Inverter is activated BESS DC contactors close AC and DC contactors of inverter cl...

Страница 24: ...e below provides a list of telemetry signals that are available to query over the API Table 5 1 List of tele metry signals NAME UNIT DESCRIPTION Bms Cell Temperature oC Cell temperature across all rac...

Отзывы: