USER MANUAL - OPTIMA UPS 6K/ 10K (ENGLISH)
______________________________________________________________________________________________________________________
20150610 Tower-Rack 6K-10K ISOTX
- 3
TABLE OF CONTENTS
1. SAFETY
2. AVAILABLE MODELS
3.- UPS INSTALLATION: SITE PLANING
SITE INSPECTION & INSTALLATION CONDITIONS
RACK UPS INSTALLATION
TOWER UPS INSTALLATION
EXTERNAL CIRCUIT BREAKERS SELECTION
WIRING SELECTION
4.- UPS INSTALLATION: SINGLE UPS - TERMINAL BLOCK
UPS AC LINES CONFIGURATION
AC TERMINAL BLOCKS
EXTERNAL BATTERY CONNECTION
5.- UPS INSTALLATION: PARALLEL UPS - TERMINAL BLOCK
GENERAL COMMENTS
UPS AC LINES CONNECTION
PARALLEL CONTROL CABLES CONNECTION
6.- START-UP: SINGLE UPS
INSPECTION BEFORE START-UP
SINGLE UPS - START UP PROCEDURE
7.- START-UP: PARALLEL UPS
REQUIREMENTS FOR PARALLEL UPS SYSTEMS
INSPECTION BEFORE START-UP
PARALLL UPS - START UP PROCEDURE
8.- OPERATION INTERFACE
FRONT PÀNEL: PUSH BUTTONS / LEDS / LCD
9.- OPERATION: SINGLE UPS
10.- OPERATION: PARALLEL UPS
REMOVING UPS FROM PARALLEL SYSTEM
ADDING UPS TO PARALLEL SYSTEM
11.- UPS CONFIGUIRATION
12.- ERROR CODES, ALARMS & TROUBLESHOOTING
13.- TECHNICAL SPECIFICATIONS
14.- WARRANTY