background image

Figure 1: Alveo Card Features

Fan

(for Active configuration only)

PCIe 

Connector

Micro-USB

Interface

Network

Interface

NoteOn the Alveo U280 card, the micro-USB is located on the opposite end of the card between the PCB
board and the enclosure.

Passive and Active Cooling Cards

Alveo™ cards are available in both active and passive cooling configurations, as shown in the
following figures. The passive cooling card is designed to be installed into a data center server,
where controlled air flow provides direct cooling. The active cooling card is designed to be
installed into a PC environment where the air flow is uncontrolled; consequently, this
configuration includes a heat sink and fan enclosure cover to provide appropriate cooling.

For card specifications, dimensions, list of card features, and block diagram see Alveo U200 and
U250 Data Center Accelerator Cards Data Sheet
 (

DS962

) and Alveo U280 Data Center Accelerator

Cards Data Sheet (

DS963

).

Chapter 2: Accelerator Card Overview

UG1301 (v1.8) February 5, 2021

 

www.xilinx.com

Getting Started with Alveo Accelerator Cards

 11

Send Feedback

Содержание Alveo U200

Страница 1: ...Getting Started with Alveo Data Center Accelerator Cards UG1301 v1 8 February 5 2021...

Страница 2: ...ated operating system Card Interfaces and Details Clarified description XRT and Deployment Platform Installation Procedures on RedHat and CentOS Updated installation steps for the Alveo U200 and U250...

Страница 3: ...e qualified servers Chapter 4 Installing the Deployment Software Replaced xbutil command with the new xbmgmt command for card flashing Updated output logs Known Issues Added a known issue XRT and Depl...

Страница 4: ...tions on upgrading and downgrading XRT and the deployment shell Generating the xbmgmt flash update Command Updated instructions 01 23 2019 Version 1 2 XRT and Deployment Platform Installation Procedur...

Страница 5: ...lling the Deployment Software 21 XRT and Deployment Platform Installation Procedures on RedHat and CentOS 21 XRT and Deployment Package Installation Procedures on Ubuntu 25 Chapter 5 Card Bring Up and...

Страница 6: ...Regulatory and Compliance Information 49 CE Directives 49 CE Standards 49 Compliance Markings 50 Appendix F Additional Resources and Legal Notices 51 Xilinx Resources 51 Documentation Navigator and D...

Страница 7: ...d debugging applications on your Alveo accelerator cards Running Applications To configure a system to run accelerated applications install an Alveo card into a system as described in Chapter 3 Card I...

Страница 8: ...system management bus SMBus voltage current and temperature monitoring Electrical Design Power 65W PCIe slot functional with PCIe slot power only 140W PCIe slot functional with 110A max VCCINT curren...

Страница 9: ...rivers and utilities Hard disk space Satisfy the minimum system requirements for your operating system Licensing None required for application deployment For the application development environment se...

Страница 10: ...5 and is not compatible with an ATX12V EPS12V power cable source Two QSFP28 interfaces Currently these interfaces are not supported by the deployment platform A micro USB connector for maintenance pu...

Страница 11: ...to a data center server where controlled air flow provides direct cooling The active cooling card is designed to be installed into a PC environment where the air flow is uncontrolled consequently this...

Страница 12: ...ve Cooled Card Configuration Figure 3 Passive Cooled Card Configuration Chapter 2 Accelerator Card Overview UG1301 v1 8 February 5 2021 www xilinx com Getting Started with Alveo Accelerator Cards 12 S...

Страница 13: ...mputer server clean and clear of debris Before opening the computer system cover unplug the power cord Dispositif de S curit Pour assurer votre s curit personnelle et la s curit de votre quipement Mai...

Страница 14: ...s ESD lors du retrait et remplacement des composants Pour pr venir les dommages dus aux ESD Utilisez une sangle de poignet ou de cheville anti ESD et assurez vous qu elle est en contact avec la peau B...

Страница 15: ...ue sensibles et fragiles l quipement doit tre install par un technicien certifi seulement Cet quipement est destin tre install dans un lieu d acc s restreint WICHTIG Die Karten Alveo sind sensible und...

Страница 16: ...ou are installing the Alveo card 4 Plug the Alveo card in the PCIe x16 slot on the motherboard 5 Connect the AUX power connector to the Alveo card ensure the plug is mechanically fixed with the click...

Страница 17: ...vely cooled cards connect the power cable to the AUX power connector at the side of the card as shown in the following figure Chapter 3 Card Installation Procedures UG1301 v1 8 February 5 2021 www xil...

Страница 18: ...le ATX12V EPS12V Dadurch wird die Alveo Karte besch digt und die Garantie erlischt The power supply can have an 8 pin or a 6 pin power connector configuration Some power supplies label this cable PCIe...

Страница 19: ...vom 8 Pin Anschluss The following example shows a successfully installed active configuration Alveo card Figure 6 Installed Alveo Card PCIe Edge Connector PCIe AUX Power Cable 6 If you previously rem...

Страница 20: ...bit prefetchable size 256K Capabilities 40 Power Management version 3 Capabilities 60 MSI X Enable Count 32 Masked Capabilities 70 Express Endpoint MSI 00 Capabilities 100 Advanced Error Reporting Cap...

Страница 21: ...s not necessary to run applications For platform features and details see Alveo Data Center Accelerator Card Platforms User Guide UG1120 If you encounter any issues during installation see Chapter 7 T...

Страница 22: ...ons in v1 5 of Getting Started with Alveo Data Center Accelerator Cards UG1301 5 Install the XRT installation package by running the following command from within the directory where the XRT installat...

Страница 23: ...rmware blinkt da dies dazu f hren kann dass die Karte nicht mehr funktioniert Successfully flashing a new card results in a message similar to the following If the command returns Card Not Found perfo...

Страница 24: ...eboot is necessary Updating SC firmware on card 0000 65 00 0 Stopping user function Successfully flashed Card 0000 65 00 0 1 Card s flashed successfully If the card is up to date you will see a messag...

Страница 25: ...lveo U250 Product Page Note For the U280 Alveo data center accelerator card follow the instructions in v1 5 of Getting Started with Alveo Data Center Accelerator Cards UG1301 2 Install the XRT install...

Страница 26: ...lashed Are you sure you wish to proceed y n Flashing will take up to 10 minutes IMPORTANT Do not enter Ctrl c in the terminal while the firmware is flashing as this can cause the card to become inoper...

Страница 27: ...e It has the following format sudo opt xilinx xrt bin xbmgmt flash update shell base_name card card_bdf See Appendix D Obtaining xbmgmt Command Options for obtaining the command options You will be as...

Страница 28: ...After the shell partition is programmed it is not necessary to reprogram it unless the system is warm or cold rebooted IMPORTANT Prior to running an application on DFX 2RP platform it is necessary to...

Страница 29: ...installed card s and report additional card details including memory PCIe platform name and system information See Vitis Unified Software Platform Documentation Application Acceleration Development U...

Страница 30: ...xclmgmt Kernel modules xclmgmt 65 00 1 Processing accelerators Xilinx Corporation Device 5005 Subsystem Xilinx Corporation Device 000e Flags bus master fast devsel latency 0 IRQ 64 NUMA node 0 Memory...

Страница 31: ...le partitions installed in system If these versions do not match perform a cold reboot and retry Running xbmgmt partition The xbmgmt partition command for Dynamic Function eXchange platforms supportin...

Страница 32: ...the card identified with BDF card_bdf In the previous example xilinx_u250_gen3x16_xdma_shell_3_1 will be programmed to card with BDF 00 65 00 0 See Appendix D Obtaining xbmgmt Command Options to obta...

Страница 33: ...through PCIe b Memory test Data transfer between kernels and card memory Prior to running an application including the validation application it is necessary to first program the shell partition to th...

Страница 34: ...dation INFO PCIE peer to peer test SKIPPED INFO Starting memory to memory DMA test bank0 bank1 M2M bandwidth 12426 MB s bank0 bank2 M2M bandwidth 12392 3 MB s bank0 bank3 M2M bandwidth 11347 MB s bank...

Страница 35: ...g verify kernel test Verify xclbin not available Skipping validation INFO verify kernel test SKIPPED INFO Card 0 validated successfully INFO All cards validated successfully Chapter 5 Card Bring Up an...

Страница 36: ...applications for Alveo cards Installation instructions can be found in Vitis Unified Software Platform Documentation Application Acceleration Development UG1393 For an overview of developing accelerat...

Страница 37: ...pecifications and passive cards are in a system that provides adequate airflow For more information about airflow requirements see Alveo U200 and U250 Data Center Accelerator Cards Data Sheet DS962 an...

Страница 38: ...cold reboot and then re flash the card Run time fails with following message Error Failed to find Xilinx platform Failed to source the setup sh script Source opt xilinx xrt setup sh When installing t...

Страница 39: ...hen cold reboot and see if the card trains to the correct settings General The card is not present when running xbutil or lspci The card may not have been ready when the server enumerated PCI Express...

Страница 40: ...ologiciel clignote car cela pourrait rendre la carte inutilisable WICHTIG Geben Sie im Terminal nicht Strg c ein w hrend die Firmware blinkt da dies dazu f hren kann dass die Karte nicht mehr funktion...

Страница 41: ...um remove xrt 3 Follow the installation procedures outlined in the chapter Installing the Deployment Software in v1 5 of Getting Started with Alveo Data Center Accelerator Cards UG1301 Uninstalling Pa...

Страница 42: ...Center Accelerator Cards UG1301 To downgrade perform the following steps 1 Restore the card to the original manufacturing state by following the instructions in Appendix C Reverting the Card to Facto...

Страница 43: ...gpgcheck 1 gpgkey file etc pki rpm gpg RPM GPG KEY CentOS 7 enabled 1 C7 4 1708 updates name CentOS 7 4 1708 Updates baseurl http vault centos org 7 4 1708 updates basearch gpgcheck 1 gpgkey file etc...

Страница 44: ...1708 with 7 5 1804 Similarly for CentOS 7 6 create the repo file etc yum repos d centos76 repo and add the previously listed content replacing 7 4 1708 with 7 6 1810 Appendix B Creating a Vault Repos...

Страница 45: ...0 Card type uxx Flash type SPI Flashable partition running on FPGA xilinx_uxx_GOLDEN_x SC x x Flashable partitions installed in system None In this output under Flashable partition running on FPGA no...

Страница 46: ...Alveo Data Center Beschleunigerkarte unter Xilinx Answer Record AR 71915 F hren Sie die mit der Xilinx Answer verbundenen Reparaturanweisungen aus bevor Sie fortfahren Appendix C Reverting the Card t...

Страница 47: ...used to flash the base partition sudo opt xilinx xrt bin xbmgmt flash update shell base_name card card_bdf The following command is used to program the shell partition sudo opt xilinx xrt bin xbmgmt p...

Страница 48: ...terface uuid 695718ec21a232e45e1afcb4e558e11f xilinx_u250_gen3x16_xdma_shell_3_1 logic uuid bd5fb8abab266c3265918257b5048e88 interface uuid f2f6c5e1273e78948f2c4806221462f2 Partitions installed in sys...

Страница 49: ...Electromagnetic Compatibility EN 55032 2015 Information Technology Equipment Radio Disturbance Characteristics Limits and Methods of Measurement EN 55024 2015 Information Technology Equipment Immunity...

Страница 50: ...er Xilinx has also elected to join WEEE Compliance Schemes in some countries to help manage customer returns at end of life If you have purchased Xilinx branded electrical or electronic products in th...

Страница 51: ...dows select Start All Programs Xilinx Design Tools DocNav At the Linux command prompt enter docnav Xilinx Design Hubs provide links to documentation organized by design tasks and other topics which yo...

Страница 52: ...gal Notices The information disclosed to you hereunder the Materials is provided solely for the selection and use of Xilinx products To the maximum extent permitted by applicable law 1 Materials are m...

Страница 53: ...N APPLICATIONS THAT AFFECT CONTROL OF A VEHICLE SAFETY APPLICATION UNLESS THERE IS A SAFETY CONCEPT OR REDUNDANCY FEATURE CONSISTENT WITH THE ISO 26262 AUTOMOTIVE SAFETY STANDARD SAFETY DESIGN CUSTOME...

Отзывы: