Copyright | NZS Installation and Operation Manual
29
Take out copper row 1 (2PCS), M6*16 hexagonal combination screws (4PCS), M8 flange face
nuts (2PCS) from the accessories, put copper row 1 to the left, fix the first group and the
second group of cell modules, the third group and the fourth group of cell modules, respec-
tively, and tighten them with a socket. Check the torque with the help of torque wrench (M6
screw 10NM, M8 flange nut 15NM), and then wrap with high temperature insulation tape.
Take out the copper row 2 (1PC), M6 hexagonal combination screw (2PCS), M8 flange face nut
(1PC) from the accessories. The second and third group of battery modules are fixed to the right
with copper row 2 and tightened with a socket and check the torque with the help of a torque
wrench (M6 screw 10 NM, M8 flange nut 15NM), then wrap with high temperature insulating tape.
Close the upper and lower doors of the battery compartment and tighten the screws.
Battery Compartment
Protection plate
To ensure insulation safety, there are four pieces of protection plate assembled in front of
battery. Protection plates need to be disassembled firstly, then connect cooper bar with
battery.
Copper row 1
Copper row 2
Содержание NZS Series
Страница 2: ......
Страница 12: ...2380 2300 1548 1395 1242 1096 5 1017 75 991 5 1123 750 8 Copyright NZS Installation and Operation Manual...
Страница 61: ......