Monitoring Operation
2–14
975-0240-01-01
Reading the Meters Screen
The Meters screen displays total system power production, grid voltage and
current status, and load voltage and current status.
To view the Meters screen:
u
On the XW Inverter/Charger setup menu, highlight “Meters” and press Enter.
Standby
The unit is placed in Standby mode using the XW System Control Panel “Mode” on the Setup
menu or the Standby button on the SCP or using the Standby key press (On/Off and
Equalization) on the Inverter Information Panel.
Passthru
The AC connected to the AC1 or AC2 input is passing directly through the XW Inverter/Charger
to the loads. The batteries are not being charged in this state.
Equalize
Equalization has been turned on and the XW Inverter/Charger is equalizing the batteries after
completing a full charge cycle. The equalize screen (see Figure 2-7) shows battery voltage, input
current, battery temperature, and equalization time elapsed and remaining.
Figure 2-7
XW Inverter/Charger Home Screen (Equalize)
Table 2-1
XW Inverter/Charger Home Screen States
XW Inverter/
Charger Status
Displayed When...
menu
XW6048 00:Equalize
48V +5A 95
o
F
31 min.
60 min.
Figure 2-8
Viewing the Meters Screen
Meters
3200W 4500VA
21.1A 120V
21.1A 120V
0W 0VA
0.0A 0V
0.0A 0V
3200W 4500VA
21.1A 120V
21.1A 120V
Float
3.7A 57.4V
20
°
C
XW6048 00: Setup
Meters
[Enabled]
[Disabled]
[Disabled]
[Enabled]
[Bulk]
[Disabled]
[Operating]
Содержание XW4024-120
Страница 2: ......
Страница 3: ...XW Series Inverter Charger Operation Guide...
Страница 10: ...viii...
Страница 14: ...xii...
Страница 22: ...1 8...
Страница 38: ...2 16...
Страница 92: ...4 26...
Страница 111: ......