![Xantrex PH1800-GFP Скачать руководство пользователя страница 62](http://html1.mh-extra.com/html/xantrex/ph1800-gfp/ph1800-gfp_installation-manual_3176236062.webp)
Installation
3–22
975-0289-01-01
Power Down Procedure
If softwired......
To Power Down the PowerHub 1800:
Figure 3-20
Power Down Procedure for Softwired Installations
Disconnect Loads.
Press ON/OFF Switch to turn
OFF Inverter/Charger.
Disconnect the PowerHub
from the generator and
turn the generator OFF.
Disconnect the Battery Box(es)
from the Inverter.
1
2
3
4
OFF
975-0289-01-01(PowerHub_1800_IG).book Page 22 Thursday, June 4, 2015 9:49 AM
Содержание PH1800-GFP
Страница 2: ...975 0289 01 01 PowerHub_1800_IG book Page 2 Thursday June 4 2015 9 49 AM ...
Страница 20: ...ii 975 0289 01 01 PowerHub_1800_IG book Page ii Thursday June 4 2015 9 49 AM ...
Страница 30: ...1 10 975 0289 01 01 PowerHub_1800_IG book Page 10 Thursday June 4 2015 9 49 AM ...
Страница 66: ...3 26 975 0289 01 01 PowerHub_1800_IG book Page 26 Thursday June 4 2015 9 49 AM ...
Страница 74: ...2 975 0289 01 01 PowerHub_1800_IG book Page 2 Thursday June 4 2015 9 49 AM ...
Страница 75: ...975 0289 01 01 PowerHub_1800_IG book Page 3 Thursday June 4 2015 9 49 AM ...