Introduction
1–6
975-0289-01-01
Hardwired Permanent Applications
Utility Backup Applications
Important:
Installations of this kind must be certified/approved as
“code-compliant” to the national and local building and electrical codes.
Installers should have adequate knowledge of national and local code to ensure
the installation passes inspection by the local electric authority.
Figure 1-5
Hardwired Utility Applications
Example only.
Actual installation may vary.
Important:
The combination of loads
cannot exceed 1440 W. Run-times will depend
on the amp-hour rating of the batteries.
AC Distribution Panel
(Sub-Panel)
Main AC
Panel
120 Vac
Outlets
AC IN
AC OUT
975-0289-01-01(PowerHub_1800_IG).book Page 6 Thursday, June 4, 2015 9:49 AM
Содержание PH1800-GFP
Страница 2: ...975 0289 01 01 PowerHub_1800_IG book Page 2 Thursday June 4 2015 9 49 AM ...
Страница 20: ...ii 975 0289 01 01 PowerHub_1800_IG book Page ii Thursday June 4 2015 9 49 AM ...
Страница 30: ...1 10 975 0289 01 01 PowerHub_1800_IG book Page 10 Thursday June 4 2015 9 49 AM ...
Страница 66: ...3 26 975 0289 01 01 PowerHub_1800_IG book Page 26 Thursday June 4 2015 9 49 AM ...
Страница 74: ...2 975 0289 01 01 PowerHub_1800_IG book Page 2 Thursday June 4 2015 9 49 AM ...
Страница 75: ...975 0289 01 01 PowerHub_1800_IG book Page 3 Thursday June 4 2015 9 49 AM ...