Index
56
975-0126-02-01
connecting AC input wires
20
connecting AC output wires
20
connecting battery temperature sensor (BTS)
31
connecting BTS cable to BTS jack
34
connecting cables to inverter/charger
25
connecting DC cables
23
connecting Echo Charger
29
connecting network
35
DC grounding
28
materials required
14
mounting the inverter/charger
18
overview
15
performing checks prior to initial start-up
36
routing DC cables
24
testing Echo Charger
38
testing in AC bypass mode
38
testing in charge mode
37
testing in invert mode
37
tools required
14
installation codes
2
inverter specifications
38
inverter/charger, heavy load precaution
18
K
key performance factors
5
L
liquid neoprene
49, 51
lithium grease
49
M
maintaining batteries
48
materials list
13
materials required for installation
14
mounting orientations
18
P
parallel battery connection
52
physical specifications
38
plates
40
preparing Echo Charger cable
29
preparing ground cable
23
R
related product literature
iii
S
sealed gel-cell batteries
42
series battery connection
53
series-parallel battery connection
54
specifications
38
starting batteries
41
strain relief
14, 20
stratification
40
sulfation
40
T
temperature compensation
40
tools required for installation
14
U
United States Coast Guard electrical regulations
2
V
ventilation openings, recommended clearance
16
X
Xantrex, web site
iii
Содержание MS2000
Страница 1: ...MS2000 Sine Wave Inverter Charger Installation Guide MS2000 ...
Страница 2: ......
Страница 3: ...MS2000 Sine Wave Inverter Charger Installation Guide ...
Страница 8: ...iv 975 0126 02 01 ...
Страница 16: ...xii ...
Страница 18: ...xiv ...
Страница 45: ...Installation 975 0126 02 01 27 Figure 9 Completed DC Wiring ...
Страница 57: ...Installation 975 0126 02 01 39 Figure 18 Inverter Charger Dimensions 14 2 361 ...
Страница 75: ......