Pg. 6
v.1.1
4.
Checklists
a)
Normal Operation
Preflight Checklist
1.
Check that the pylons are properly installed onto the wing
2.
Check for loose parts or wires
3.
Check foam and plastic components for signs of damage
4.
Propellers are tight and installed to rotate in the proper direction
5.
Battery fully charged
6.
Battery installed, power not connected
7.
Battery hatch secured
8.
Center of Gravity (CG) is within tolerance
9.
Payload is within maximum allowable weight limit
Before Takeoff
1.
Transmitter on
2.
Transmitter charged
3.
Correct flight mode selected
4.
Area free of obstructions 10 ft. around craft
5.
No obstructions overhead
6.
Connect battery
7.
Connect ground station (optional)
8.
(Platinum option) Press and hold safety switch
9.
Arm motors
10.
Check motor direction
Takeoff
1.
Increase throttle to climb
2.
Climb vertically to 15 ft
3.
Check control response
4.
Proceed with flight
Before Landing
1.
Check landing area for obstructions
2.
Fly to landing site
3.
Transition to hover
4.
Descend to 50 ft
Landing
1.
Descend vertically at a reasonable rate
2.
Adjust position during descent to land at desired location
3.
Reduce throttle to minimum after touchdown
4.
Disarm motors