II. Making the electrical connections
Connecttheleadswiththehelpofscrew-,solder-,crimped-orcompression-connectors.
Thoroughlycleanoffanycontactgreasewhichmayescape.
For cable NYFGY:
InaccordancewithVDE0100,theflatwiresheathingmustbebridged.Forthis,trimtheinsulationoffboth
endsofaninsulatedcopperlead(H07V-V,H07V-K)ofatleast6mm
2
cross-sectionandfastentoboth
sidesofthearmouringwithawirering,acircliporascrollspring.
Thoroughlycleanleadinsulations,connectorsandroughenedcablecasing.
III. Insulation spacings
Theremustbeaspacingofatleast5mmbetweentheconnectors.
ForsleevesMU1toMU5,therearespacersprovidedforthispurpose(seesketch).
Insertthespacersoffsetbetweentheconnectorsandadjustthem.
The insulating spacing between the mould and the connectors must be at least 5 mm.
Fitting the spacers
Seal the cable inlets
Coils of insulating tape
Mould
IV. Fitting the casting mould
1. Foldthetwohalvesofthecastingmouldtogetherovertheconnection.
2. Checktheinsulationspacingswithcare(itwillbepossibletorevolvethemould).
3. Sealthecableinletswithinsulatingtape(seesketch).
V. Pouring the resin and putting the sleeve to use
Mixthecastingresininaccordancewiththeattachedapplicationinstructionsandpourslowlyintothefiller
funnel.
Thesleeveisimmediatelyreadyforuse(0.6/1kV).
Forcurrentofupto10kV,observeacuringtimeof45minutes.
Removethefillerfunnelandputontheclosure.
VI. Scope of delivery
Casting moulds, insulating tape, pouch of casting resin, spacers
(MU1toMU6),protectiveglovesandclosure.