Unpacking
When you receive your Wunderbar, it will be fully commissioned three times at our
shop and ready to use. It roughly takes two hours to unpack, set it on the stand (see
instruction below), plug in all the XLR connectors, and start recording and mixing!
Keep the PEQ2’s unloaded until the desk in in its final place on the stand. The
easiest way to remove the console from the crate is to fully disassemble all the
sides of the crate, then use 2 padded dollies to move the desk by gently resting the
desk on it’s back panel (the panel above the d-subs) with the armrest pointing
towards the ceiling.
Bring the desk to the area where you want to set it on the stand by resting it on the
floor on padded blankets, armrest still toward the ceiling and then build the stand as
described in this manual. When it is in place on the stand, power up the desk before
installing any PEQ2 modules to check that the console is properly functioning after
being shipped. Then turn it off to load the PEQ2 modules.
When loading the PEQ2 modules, always start at one end using the aluminum side
of the 8 channel PEQ2 bucket to align the 1st module and gently slide it down the
Wunderbar Super D User's Manual Rev. 1, Dec. 2018
17
Содержание Wunderbar Super D
Страница 1: ...Wunderbar Super D Operations Manual Wunderbar Super D User s Manual Rev 1 Dec 2018 1 ...
Страница 10: ...Control Room Master Section Wunderbar Super D User s Manual Rev 1 Dec 2018 10 ...
Страница 21: ...Wunderbar Super D User s Manual Rev 1 Dec 2018 21 ...
Страница 23: ...Depth and Height of Console Wunderbar Super D User s Manual Rev 1 Dec 2018 23 ...