5
M06
Wunda Pumpset
✆
0800 5420 816
www.wundatrade.co.uk
THE BRAND YOU CAN TRUST
When connecting a Wunda pumpset to our High Tech
Composite manifold the pumpset support bracket
must be used to offer extra support for the heavy
pumpset. The bracket is adjustable and supplied with
2 x rubber mounts, 2 x brackets, 4 bracket bolts & 2 x
adjustable bracket nut and bolts. (Pic A)
The pumpset bracket is now ready to accept the pumpset
assembly, the flow bar is mounted to the lower section of
bracket and the return bar is mounted to the higher section
of bracket. Locate the 2 mounting rubbers, brackets & 4
securing bolts (Pic D).
Using the 4 bolts tighten and secure the brackets, securing the
pumpset to the adjustable support bracket. The pumpset will
have a small amount of movement within the brackets which
will allow for easier connection. The pumpset is now ready for
assembly onto the High Tech Composite manifold. Ensure the
supplied washers are used between the pumpset and manifold
connections (Pic F).
A
Insert the 2 adjuster
nuts into the long
slot from below
into the lower
bracket. Place the
upper section
of bracket over
the adjuster nuts
ensuring the nuts line up with the 2 holes in the
upper bracket. The long slot will secure and keep the
nuts captive (Pic B).
Pumpset connection to High Tech Composite Manifold
B
C
Screw the adjuster
bolts into the
captive nuts,
ensuring the nuts
are retained in the
slot. Do not tighten
at this stage (Pic C).
D
Return bar
mount position
Flow bar
mount position
Wrap the rubber mount around the flow bar and return bar
and place a bracket over each of the rubber mounts (Pic E)
E
Mounting Bracket
Rubber Mount
Once the pumpset has been connected and tightened to the
manifold, the bolts on the adjustable bracket can be tightened
(Pic G)
Manifold not included in Pumpset contents
F
G
Revision date: 25/4/2018