Installation
System 182
3 - 22
ba75503e07
04/2012
3.5.3
Panel mounting
Materials required
PMS/IQ kit for panel mounting (see chapter 11 A
).
Tools
3 mm set screw wrench (contained in the panel installation kit).
Switch panel aperture
Fig. 3-19 Mounting aperture in the switch panel (dimensions in mm)
Note
The space required on the panel for the Universal Transmitter is given
in the dimension drawings in section 10.5.
138
138
34.5
47
11
11
4
Maximum thickness
3 mm
Содержание DIQ/S 182-PR
Страница 6: ...Contents System 182 0 4 ba75503e07 04 2012 ...
Страница 10: ...Overview System 182 1 4 ba75503e07 04 2012 ...
Страница 14: ...Safety instructions System 182 2 4 ba75503e07 04 2012 ...
Страница 78: ...Operation System 182 4 18 ba75503e07 04 2012 ...
Страница 84: ...The SETTINGS menu System 182 5 6 ba75503e07 04 2012 ...
Страница 110: ...Relay outputs System 182 6 26 ba75503e07 04 2012 ...
Страница 122: ...PROFIBUS connection System 182 7 12 ba75503e07 04 2012 ...
Страница 124: ...Maintenance and cleaning System 182 8 2 ba75503e07 04 2012 ...
Страница 130: ...What to do if System 182 9 6 ba75503e07 04 2012 ...
Страница 142: ...Accessories and options System 182 11 2 ba75503e07 04 2012 ...
Страница 146: ...Appendix store separately if required System 182 13 2 ba75503e07 04 2012 ...