Original Operating Instructions
BATD0100-ES-1-480-1 (Outdoor)
Installation
O_BATD0100-ES-1-480-1_(Outdoor)_V2.2_US
Page
66
of
110
5.5.1 Required Connections
The following cables and lines must be prepared and in flawless condition, safe
and de-energized:
•
•
AC Connection (Section 5.5.1.2)
•
DC Connection (Section 5.5.1.3)
•
Supply Voltage (Section 5.5.1.4)
•
Data Communication (Section 5.5.1.5)
•
Option Island Grid Function (Section 5.5.1.6)
Содержание BATD0100-ES-1-480-1
Страница 110: ......