Original Operating Instructions
BATD0050-ES-1-400-1
Maintenance
O_BATD0050-ES-1-400-1_V2.6_GB
Page
62
of
72
7.1
Maintenance every 12 Month
NOTICE: During each maintenance interval, the following tasks must be checked.
Table 7: Maintenance in De-energized condition (every 12 months)
Maintenance Tasks
See
Section 7.2.1
Visual Inspection of Interior Area
Section 7.2.2
Torque Check of Electrical Connections
Section 7.2.3
Condition Check of Cables and Lines
Section 7.2.4
Section 7.2.5
Functional Test of DC Circuit Breaker
Section 7.2.6
Functional Test of AC Circuit Breaker
Section 7.2.7
Functional Test of Enable Switch
Section 7.2.8
7.2
Maintenance in De-energized Condition
Procedure:
1.
Perform
procedures according to Section 4.2.2.
2.
Disconnect
the AC/DC voltage and supply voltage externally.
3.
Ensure
that the product is de-energized.
7.2.1 Visual Inspection of Housing
Maintenance Tasks:
1.
Check
the housing for visual defects e.g. corrosion, discolouration or damages.
In case of visual defects,
repair
these immediately.
2.
Check
if any safety signs and type plates on the housing are damaged or
missing (Figure 4).
In case of damaged or missing labels,
contact
customer service.
7.2.2 Visual Inspection of Interior Area
Maintenance Tasks:
1.
Check
the interior area for dust accumulation.
In case of dust accumulation,
remove
it from the interior area.
2.
Check
parts for discolouration or damage.
In case of discolouration or damage,
contact
customer service.