Original Operating Instructions
BATD0050-ES-1-400-1
Commissioning
O_BATD0050-ES-1-400-1_V2.6_GB
Page
49
of
72
4.2.1 Voltage Measurement DC Voltage and AC Voltage
Procedure:
1.
Measure
the DC voltage from plus to minus connection at the
DC circuit breaker inside the product (Figure 22).
NOTICE: The voltage must be positive, and the measured values must be within the
specified limits (Table 10).
2.
Measure
the AC voltage on the bottom terminals of the AC EMC filter
o
Phase to Phase
o
Phase to N
o
Phase to PE
NOTICE: The measured values must be within the specified limits (Table 10).
3.
Ensure
that the AC voltage have a clockwise rotary field.
4.
Insert
all fuses.
5.
Close
the door.
6.
Pull out
the Enable switch.
7.
Switch
the AC circuit breaker in position
ON
. The DC circuit breaker is
operated automatically.
NOTICE: Operation is started after the appropriate checks via the user interface.
4.2.2 Voltage Measurement Harmonic Filter
Procedure:
1.
Set
the product operation mode to
OFF
via the user interface.
2.
Switch
the AC circuit breaker in position
OFF
. The DC circuit breaker is
operated automatically.
3.
Wait
at least 30 minutes until working on the product.
4.
Press
Enable switch.
5.
Open
fuse holder (-F2) and
remove
all fuses (Figure 22).
6.
Measure
voltage between (-F2.2-4), (-F2.4-6), (-F2.6-2).
NOTICE: The voltage on all measurement points must be < 60 V.
7.
Insert
fuses in fuse holder (-F2) and
close
fuse holder.
8.
Close
all doors.
9.
Pull out
Enable switch.
10.
Switch
the AC circuit breaker in position
ON
. The DC circuit breaker is
operated automatically.
NOTICE: Operation is started after the appropriate checks via the user interface.