Worcester GREENSTAR II HE OIL 12/22 Скачать руководство пользователя страница 2

1.1 

General installation information and advice may be obtained

from the Oil Firing Technical Association for the Petroleum
Industry (OFTEC). Training courses are also offered by OFTEC,
leading to inclusion on their list of registered engineers.

1.2 

The appliance should be installed by a competent person. The

person installing the appliance should be aware of the Health and
Safety at Work Act and take appropriate action to ensure that the
regulations are adhered to. In order to give optimum efficiency
and trouble free operation the appliance should be commissioned
by a qualified engineer. OFTEC recommends the use of registered
engineers for the commissioning of oil-fired burners.

1.3 

The manufacturers notes must not be taken, in any way, as

overriding statutory obligations.

1.4 

The compliance with a British Standard does not, of itself,

confer immunity from legal obligations. In particular the
installation of this appliance must be in accordance with the
relevant requirements of the following British Standards and
regulations in respect of the safe installation of equipment.

BS 5410: part 1& 2: Code of practice for Oil Fired Boilers.
BS 799: part 5: Specification for Oil Storage Tanks.
BS 7593: Code of Practice for treatment of water in domestic  hot
water central heating systems.
BS 5449: part 1: Specification for forced circulation hot water
central heating for domestic premises.
BS 5955: part 8: Specification for the installation of
thermoplastic pipes and associated fittings for use in domestic
hot and cold water services and heating systems.
BS 7291: Thermoplastic pipes and associated fittings for hot and
cold water for domestic purposes and heating installations in
buildings.
BS 7074: part 1: Application, selection and installation of
expansion vessels and ancillary equipment for sealed water
systems.
BS 7671:  IEE Wiring Regulations, current edition.
The Building Regulations Part J and L1 England and Wales; Part F
and Part J Section III Scotland; Part L and Part F Northern Ireland.
Local water company bye-laws.
The Control of Pollution (Oil) Regulations.

1.5 

To ensure that the installation will perform to the highest

standards, the system and components should conform to those
mentioned in the  instructions.

2.1 

These instructions cover room sealed balanced flue (RS) appli-

ances only.

2.2 

The Worcester Greenstar HE Oil appliance covered in these

instructions has been designed to serve domestic central heating
and hot water requirements ranging from 12 kW to 22 kW.

2.3 

This RS balanced flue appliance forms a fully room sealed

system causing the combustion air to be drawn through a duct
from outside. The sealed burner cover gives excellent acoustic
noise reduction and alleviates the need for an air brick to be
located in the boiler room.

Because the balanced flue system does not rely on the cabinet
panels to form the room seal, combustion readings can be taken
from the test point on the condenser heat exchanger and the cabi-
net panels can be easily removed during installation thereby pre-
venting any damage.

2.4 

The boiler is factory set to the mid-range output and can be

altered, if necessary, by adjusting the burner as specified in Table
2. This appliance is only suitable for use with 28 second Kerosene
heating oil. 

NOTE: It is a mandatory requirement of the building
regulations that only 28 second kerosene is used on low level
discharge flues. 

2. General Information

1. Installation Regulations

2

1.

Installation Regulations ...........................................Page   2

2.

General Information .................................................Page   2

3.

Technical Data...........................................................Page   2

4.

Siting the Appliance .................................................Page   4

5.

Removal of the Cabinet............................................Page   4

6.

Air Supply..................................................................Page   4

7.

Flue System...............................................................Page   7

8.

Oil Supply ..................................................................Page 10

9. Heating and Hot Water System...............................Page 13

10. Electrical ....................................................................Page 14
11. Installation ................................................................Page 18
12. Commissioning the Appliance ................................Page 19
13. Instructions to the User ...........................................Page 20
14. Routine Cleaning and Inspection............................Page 20
15. Short Parts List..........................................................Page 23
16. Fault Finding .............................................................Page 25

Contents

3. Technical Data

Model

POWER SUPPLY
HEATING FLOW
HEATING RETURN

FUEL LINE

MINIMUM FLUE
REQUIREMENT

HEARTH TEMPERATURE
MAXIMUM STATIC HEAD

PRIMARY WATER CAPACITY

WEIGHT

BURNER

EXIT FLUE GAS
MASS FLOW

CONTROL THERMOSTAT
RANGE

CONTROL THERMOSTAT
DIFFERENTIAL

COMBUSTION PRODUCTS
SAFETY THERMOSTAT
BREAK POINT

IP RATING

*SEDBUK RATING

12/22

SPECIFICATIONS

230/240V 50 Hz

22mm

22mm

1

/

4

" BSP

Balanced Flue Kit

Page 8

Below 100°C

30m (98 ft. )

20 litres (4.4 gal.)

121 Kg (267 lbs)

Electro Oil

Sterling 40

40 kg/hr

50°C minimum
cut in to 80°C
maximum cut out

5°C

120 + 0/ – 6°C

20

90.7%

BAND A

Table 1

The value is used in the UK Government Standard Assesment Proceedure (SAP) for

energy ratings for dwellings.

Содержание GREENSTAR II HE OIL 12/22

Страница 1: ...CE INSTALLATION AND SERVICING INSTRUCTIONS BOILER OUTPUT Hot Water and Central Heating 12 22 MINIMUM 12 kW 41 000 Btu h MAXIMUM 22 kW 75 000 Btu h THESE INSTRUCTIONS APPLY TO UK MODELS ONLY THESE INST...

Страница 2: ...mentioned in the instructions 2 1 These instructions cover room sealed balanced flue RS appli ances only 2 2 The Worcester Greenstar HE Oil appliance covered in these instructions has been designed to...

Страница 3: ...22 Table 2 Electro Oil Bentone Sterling 40 Burner See Fig 27 RS Balanced Flue Appliance Fuel Nozzle Pump Pressure p s i Fuel Flow Rate Flue Gas Temp C CO2 Approx Air Setting Appliance Input kW Btu hr...

Страница 4: ...e rear of the connector protecter plate and hinge up and away 5 4 The control box can be removed by undoing the two screws in the top access cover two screws in the front two ball studs in the top and...

Страница 5: ...rt 6 Condensate drain 7 Heat exchanger drain point 8 Burner air inlet pipe 9 Oil Burner 10 Lock out reset button 11 Sight glass 12 Boiler shell 13 Auto air vent connection 14 Heating flow 15 Heating r...

Страница 6: ...condensation boiler Air is drawn in by the burner s fan from outside the appliance through the hose connected to the air inlet and combustion product evacuation concentric tube The boiler shell equipp...

Страница 7: ...ccess a suitable terminal guard must be fitted A suitable guard is available from Worcester Heat Systems Part Number 7 716 190 009 or alternatively a proprietary terminal guard may be used provided it...

Страница 8: ...nd two 45 Bends Fig 9 Flue with two 90 Bends Fig 10 Flue with one 90 and two 45 Bends Fig 11 Vertical Flue Fig 12 Vertical Flue with two extra 90 Bends Fig 13 Vertical Flue with two extra 45 Bends 125...

Страница 9: ...minal Not allowed 1200 K Vertically from a terminal on the same wall Not allowed 1500 L Horizontally from a terminal on the same wall Not allowed 750 M Above an intersection with the roof 600 Not appl...

Страница 10: ...double pipe system or single pipe system with de aerator is being installed Selection of the correct pipe diameter will depend on the position of the oil stor age tank relative to the burner and the l...

Страница 11: ...l H 4 m 13 ft maximum Fire valve to BS 5410 Fire valve to BS 5410 Isolating valve Isolating valve Fire detection element Filter Burner Burner Wall Wall b Double pipe system Isolating valve Non return...

Страница 12: ...plan Expansion Vessel Diverting valve Pump Radiator N B A drain cock should be installed at the lowest point of the heating circuit Domestic hot water cylinder Pressure gauge Safety valve To system f...

Страница 13: ...er or plastic pipe can be used The plastic pipe must be manufactured to BS 7291 and installed to BS 5955 part 8 It is important to protect the system components the plastic pipe specified must be resi...

Страница 14: ...5 Safety Check In the event of an electrical fault after the installation of the appliance the electrical system shall be checked for short circuits fuse failure or incorrect polarity of connections 1...

Страница 15: ...3 4 5 6 7 8 9 Brown Blue Blue Brown Black Plug in connector Brown Brown Orange 1 C Blue Green Yellow Blue White Grey L N E E N 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 Mains supply 230V 50Hz Brown Fig 21 Pro...

Страница 16: ...to P Remove link 1 to 3 Optional Worcester Programmer HEAT SYSTEMS HEATING ADVANCE OFF TWICE ONCE ON OFF TWICE ONCE ON SELECT LOCK SET YES SELECT PM TUE HOT WATER ADVANCE 10 WAY JUNCTION BOX NOTE If...

Страница 17: ...ue Brown Brown Orange Grey Blue Green Yellow Green Yellow Brown Green Yellow 7 8 910 Fig 24 Honeywell Y Plan NOTE When using a WHS programmer remove the orange wire from terminal 9 and connect to term...

Страница 18: ...one supplied to the pipe using a suitable adaptor Ensure that the connections are properly sealed 3 Fit the oil supply pipe as described in the following section c Single pipe system oil supply pipe 1...

Страница 19: ...s and reset the burner control box Repeat the procedure at least three times or until a steady stream of oil without air is exhausted from the bleed port Re lock the bleed port Two Pipe System A two p...

Страница 20: ...ce has been installed in a compartment check that the ventilation areas are clear 11 Clean all oil filters Some of the servicing points are covered more fully in the following instructions 14 2 Pre Se...

Страница 21: ...any debris Discard the check valve if the holes cannot be cleared or if the unit is defective and replace with a new one e Replace in the reverse order 5 It is strongly recommended that the oil atomi...

Страница 22: ...within the appliance case Test the operation of the fire valve to ensure that the mechanism operates and that the oil supply is completely isolated 14 9 Recommission the Burner 1 Connect the flexible...

Страница 23: ...R Boiler Shell Cover Equipped FCX Greenstar HE Oil 12 22 V 72 28389 8 716 103 289 0 31 BOILER Sealing AMF34D 30 x 21x 3 E 20 03889 8 716 103 290 0 32 BOILER Pipe Return FCX Greenstar HE Oil 12 22 U 72...

Страница 24: ...24...

Страница 25: ...ing out high limit control and exhaust thermostats Programmer open circuit Check by linking 1 and 2 on the connector Faulty control box Replace if necessary Flue draught incorrect Check flue draught C...

Страница 26: ...26...

Страница 27: ...27...

Страница 28: ...changed in the interests of continued improvement All goods sold are subject to our official Conditions of Sale a copy of which may be obtained on application PUBLICATION TTGB 8 716 114 728a 11 07 Wo...

Отзывы: