11
SYSTEM PRESSURE
6 720 644 864a (2010/10)
4
SYSTEM PRESSURE
4.1 SEALED HEATING SYSTEMS
This boiler is fitted to a sealed heating system which is pre-pressurised. Your installer will advise you
of the minimum and maximum pressure indicated on the pressure gauge.
B
Check regularly that the pressure is maintained.
Fig. 6
Optimum pressure when cold (area A)
B
Contact your installer or maintenance engineer if a permanent significant decrease in pressure is
indicated on the pressure gauge.
The filling method on the i System boiler will be an external filling loop, with fitted valves and a flexible
hose. The filling loop should ideally be located close enough to the boiler so that the pressure gauge
can be monitored during filling.
6720643356-1
1.1W
o
2
3
1
0
4
bar
1
A
Min
1 bar
1.5 bar
Max
Содержание GREENSTAR i SYSTEM
Страница 23: ...23 GLOSSARY 6 720 644 864a 2010 10...