background image

Manual 37351A 

MFR 11 Packages - Protection Relay 

 

 

 

 

© Woodward 

Page 55/59 

Packing a Control 

Use the following materials when returning a complete control: 
 

  protective caps on any connectors; 

  antistatic protective bags on all electronic modules; 

  packing materials that will not damage the surface of the unit; 

  at least 100 mm (4 inches) of tightly packed, industry-approved packing material; 

  a packing carton with double walls; 

  a strong tape around the outside of the carton for increased strength. 

Return Authorization Number RAN 

When returning equipment to Woodward, please telephone and ask for the Customer Service Department in 
Stuttgart [+49 (711) 789 54-0]. They will help expedite the processing of your order through our distributors or 
local service facility. To expedite the repair process, contact Woodward in advance to obtain a Return Authoriza-
tion Number, and arrange for issue of a purchase order for the unit(s) to be repaired. No work can be started until 
a purchase order is received. 
 
 

 

NOTE

 

We highly recommend that you make arrangement in advance for return shipments. Contact a Wood-
ward customer service representative at +49 (711) 789 54-0 for instructions and for a Return Authoriza-
tion Number. 

 

Replacement Parts 

≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡

 

 
When ordering replacement parts for controls, include the following information: 

  the part numbers P/N (XXXX-XXX) that is on the enclosure nameplate; 

  the unit serial number S/N, which is also on the nameplate. 

 
 

Содержание MFD 11 G59

Страница 1: ...37351A Manual Version 3 1xxx Manual 37351A MFR 11 Packages Protection Relay...

Страница 2: ...ed off before disconnecting the battery from the system Electronic controls contain static sensitive parts Observe the following precautions to prevent dam age to these parts Discharge body static bef...

Страница 3: ...ages MP G59 11 Power Supply Packages MP VDEW G59 SC 12 Wide Range Power Supply Packages NU G59N SC N 12 Measuring Inputs 13 Voltage 13 Discrete Inputs 15 Outputs 15 Relay Outputs Standard Packages G59...

Страница 4: ...Overfrequency Monitoring 38 Underfrequency Monitoring 39 Vector Phase Shift Monitoring Packages VDEW G59 G59N 40 df dt ROCOF Monitoring Packages G59 G59N 41 Relay Configuration 42 Auto Acknowledgemen...

Страница 5: ...12 Figure 3 5 Measuring inputs voltage 100 400 V versions 13 Figure 3 6 Measuring inputs voltage 690 V version 13 Figure 3 7 Measuring inputs synchronizing voltage 14 Figure 3 8 Discrete inputs 15 Fi...

Страница 6: ...the package list These packages can be found in the manual Each chapter headline points out if the described function is standard or part of a package Mounting B Flush mounting Current transformer se...

Страница 7: ...measuring voltage input ranges rated voltages Please indi cate the measuring voltage input required when ordering refer to Technical Data on page 48 66 V 115 V 1 230 V 400 V 4 400 V 690 V 7 Frequency...

Страница 8: ...r underfrequency monitoring 2 limits f f 9 9 9 9 9 9 9 Vector phase shift monitoring d dt 9 9 9 df dt ROCOF monitoring df dt 9 9 Synch check function not available for 690 V versions IE IE 9 9 1 only...

Страница 9: ...ps cigarette packages cello phane wrappers vinyl books or folders plastic bottles etc away from the control modules and work area as much as possible 4 Opening the control cover may void the unit warr...

Страница 10: ...Measuring voltage N Relay 8 MFR 11 Multi Function Relay Relay 3 Package SC Synch check Measuring voltage 100 VAC or 400 VAC The socket for the PC parameterization is situated on the side of the unit...

Страница 11: ...MFR 11 Wiring Diagram r13ww 3705 ap skf 12 11 10 9 13 16 15 14 Relay 8 6 5 Measuring voltage L3 Measuring voltage N 1 Measuring voltage three wire or four wire system 2 4 3 Measuring voltage L1 Measu...

Страница 12: ...llimeters mm to AWG and vice versa AWG mm AWG mm AWG mm AWG mm AWG mm AWG mm 30 0 05 21 0 38 14 2 5 4 25 3 0 95 600MCM 300 28 0 08 20 0 5 12 4 2 35 4 0 120 750MCM 400 26 0 14 18 0 75 10 6 1 50 300MCM...

Страница 13: ...asuring voltage L2 2 5 mm 3 Measuring voltage L3 2 5 mm 4 400V direct or trans former 100V Neutral point of the 3 phase system transformer 2 5 mm 690 V version Measuring voltage L3 L2 L1 N G 3 4 5 6 L...

Страница 14: ...t connected minor inaccuracies will occur during the three phase power measurement Functionality will not be affected if the voltage L3 is not con nected and the power measurement is configured as sin...

Страница 15: ...otective functions remote acknowl edgement not in the 690 V version 2 5 mm Outputs Relay Outputs Standard Packages G59 G59N A B Relay output Relay output external device external device external devic...

Страница 16: ...f live lines like phone lines will destroy the unit CAUTION The connection cable delivered with the DPC must be used between DPC and the unit to ensure proper functionality of the unit An extension or...

Страница 17: ...to any potential source The following protective functions cannot be blocked via this discrete input Overvoltage monitoring Overfrequency monitoring Zero voltage monitoring External acknowledgement o...

Страница 18: ...gize if the unit is not ready for operation Relay 2 3 Terminal 11 through 16 Output relay type change over contact The relay manager controls this relay NOTE For units with Package SC the synch check...

Страница 19: ...t Packages VDEW G59 G59N Ph shift df dt ROCOF Packages G59 G59N Fault df Table 4 1 Alarm messages Alarm Acknowledgement A fault alarm is indicated by the Alarm LED By pressing the Clear button the act...

Страница 20: ...configuration cable there DPC MFR 1 L2 L23 L1 L12 L3 L31 Hz Reversible Display Operating Display Menu Digit Cursor Clear Alarm Converting Controlling Monitoring Select 14 1 2 13 12 4 3 5 7 6 Figure 5...

Страница 21: ...ellow Indication of the delta voltages If this LED is illuminated the values indicated on the display are the delta voltages phase phase 3 Operation Color Green Operation This LED is illuminated const...

Страница 22: ...is saved by pressing the Select push button once By pressing the button again the user causes the system to advance to the next configuration screen 13 Menu Digit Color none Menu Digit Automatic mode...

Страница 23: ...m are indicated If the application is a three wire system the configuration screen Volt Measuring must be configured to phase to phase The Wye LED will not illuminate in this application The Wye LED i...

Страница 24: ...of all alarm messages that the control may monitor for depending on how the unit is configured Alarm type Alarm text Overvoltage level 1 Standard Overvolt 1 Overvoltage level 2 Standard Overvolt 2 Und...

Страница 25: ...operator to reverse up to four previous screens exception it is not possible to reverse from the first parameter to the last parameter To perform the reverse function through the parameter screens the...

Страница 26: ...he parameters Configuration is blocked Code level CS1 Basic Service Level Factory password 0 0 0 1 This code level entitles the user to change selected controller set points enable auto clearing displ...

Страница 27: ...onfiguration access is granted by entering the appropriate password Code level 1 2 If an incorrect code number has been entered configuration is blocked OFF Password protection is disabled Access to c...

Страница 28: ...PC and the unit via the DPC Plug one side to the configuration plug of the unit and the other side to the COM1 port of your laptop PC other possibilities are described in the installation manual You...

Страница 29: ...appear Potential Transformer Configuration NOTE The screens described below are not available in the 690 V versions Standard Units not Packages SC SC N Volt transformer secondary 000V Potential transf...

Страница 30: ...oltages measured without a potential transformer secondary and primary voltage must be configured the same Volt transformer prim MN 00 000kV Mains potential transformer primary 00 100 to 65 000 kV The...

Страница 31: ...e inherent delay of the breaker regardless of the fre quency differential of the two systems If the voltage and frequency differential of the two systems are within permissible limits the breaker clos...

Страница 32: ...oltage differential 0 1 to 15 0 A close command will not be issued until the measured differential voltage of the two systems is less than value configured here An internal hysteresis of 12 5 of the v...

Страница 33: ...phase earth fault in a compensated or isolated mains resulting in the voltage protec tion tripping The only effect on the screen Voltage measuring is the one de scribed in the above note The settings...

Страница 34: ...e must ex ceed and remain above the configured threshold without interruption for at least the period of time specified in this screen Screen for Phase neutral Overvoltage 2 Phase N 000V Screen for Ph...

Страница 35: ...all below and remain below the configured threshold without interruption for at least the period of time specified in this screen Screen for Phase neutral Undervoltage 2 Phase N 000V Screen for Phase...

Страница 36: ...neutral 1 2 to 87 V 4 6 to 300 V The threshold for detecting a zero voltage condition is defined by this parameter If this limit is reached or fallen below the unit does not display a message If a rel...

Страница 37: ...layed Asymmetry Response v 00V Maximum permissible asymmetry 0 to 99 V The maximum voltage asymmetry is defined by this parameter If this limit is reached or exceeded the unit outputs the message Asym...

Страница 38: ...gized Overfrequency 1 Delay 00 00s Pickup delay level 1 0 02 to 99 98 s In order to initiate an overfrequency level 1 alarm the measured frequency must exceed and remain above the configured threshold...

Страница 39: ...derfrequency 1 Delay 00 00s Pickup delay level 1 0 02 to 99 98 s In order to initiate an underfrequency level 1 alarm the measured frequency must fall below and remain below the configured threshold w...

Страница 40: ...e shift monitoring is disabled and the subsequent screens of this function are not displayed Phase jump monit Vector phase shift monitoring one three phase 3 phase only one three phase An alarm will b...

Страница 41: ...ge can be suppressed with the discrete input Blocking of protective functions remote acknowledgement df dt Monitoring ON df dt monitoring ON OFF ON Rate Of Change Of Frequency monitoring is enabled Th...

Страница 42: ...cked with the discrete input Blocking of protective functions remote acknowledgement are only reset after the fault condition is no longer present Auto clearing Relays configured ON refer to Auto Ackn...

Страница 43: ...dard Overvolt Overvoltage level 1 and 2 Undervoltage Standard Und volt Undervoltage level 1 and 2 Asymmetry Standard Asymmetry Overfrequency Standard Overfreq Overfrequency level 1 and 2 Underfrequenc...

Страница 44: ...relay will energize only if the assigned monitoring function has tripped R The relay is configured as normally closed N C contacts The relay is always energized and will only de energize release if t...

Страница 45: ...11 G59 has a protective function that is required to output a signal to relays 2 4 and 7 That protective function relay assignment should be configured as 2470 The sequence of the numbers has no sign...

Страница 46: ...cuit breaker must be disconnected at the unit circuit breaker The field rotation must be monitored for proper rotation Any absence of or incorrect connection of voltage measuring devices or other sign...

Страница 47: ...Dimensions r1ww 3605 ab skf 50 mm 130 mm 96 mm 8 90 mm 130 mm 72 mm 65 mm 27 mm 35 mm Back view with connecting terminals Bottom view Back plate mounting optional please order brackets P N 8923 1023...

Страница 48: ...age Vph ground 1 150 Vac 4 300 Vac 7 400 Vac Rated surge voltage 1 2 5 kV 4 4 0 kV 7 4 0 kV Measuring frequency 40 0 to 80 0 Hz Accuracy Class 1 Resistance 0 1 Linear measuring range 1 3 Vrated Input...

Страница 49: ...mm Front cutout W H 91 1 0 67 0 7 mm Wiring Screw type terminals 2 5 mm Recommended tightening torque 0 5 Nm use 60 75 C copper wire only use class 1 wire only or equivalent Weight approx 800 g Prote...

Страница 50: ...0 to 80 0 Hz 0 05 Hz Voltage VL1 VL2 VL3 VL12 VL23 VL31 0 to 520 V 0 to 65 kV 1 Accuracy depending on the configured transformer ratio Reference conditions The data apply to the following reference c...

Страница 51: ...9 0002 Direct parametr YES NO NO Y N Y N MEASUREMENT Volt Measuring Phase to phase Phase neutral Phase neutral pp pn pp pn Volt transformer secondary 50 to 125 50 to 480 V 100 400 V Volt transformer p...

Страница 52: ...tor 3ph B1 G3 B1 G3 Zero voltage V ph ph 3 to 180 V 12 to 520 V Phase N 2 to 87 V 6 to 300 V Zero voltage Delay 0 02 to 99 98 s 0 25 s Zero voltage Hysteresis 0 to 99 V 1 4 8 V SC SC N Release delay Z...

Страница 53: ...aring Display ON OFF ON 1 0 1 0 Clearing display after 1 to 99 s 1 s Change relay allocation YES NO YES Y N Y N SC SC N Funct relay 12 R release E R RE Funct relay 123 R release E R REE G59 G59N Funct...

Страница 54: ...ses your problem can be resolved over the phone If not you can select which course of action you wish to pursue based on the available services listed in this section Returning Equipment for Repair If...

Страница 55: ...partment in Stuttgart 49 711 789 54 0 They will help expedite the processing of your order through our distributors or local service facility To expedite the repair process contact Woodward in advance...

Страница 56: ...following international Woodward facilities to obtain the address and phone number of the facility nearest your location where you will be able to get information and service Facility Phone number USA...

Страница 57: ...oll free or local phone numbers e mail us or use our website and refer ence technical support Product Training is available on site from several of our worldwide facilities at your location or from GE...

Страница 58: ..._______________ Control see name plate Unit no and Revision P N ____________________ REV ____________ Unit type MFR 11____________________________________ Serial number S N ___________________________...

Страница 59: ...e 29 70565 Stuttgart Germany Phone 49 711 789 54 0 Fax 49 711 789 54 100 stgt info woodward com Homepage http www woodward com power Woodward has company owned plants subsidiaries and branches as well...

Отзывы: