
Manual 37442B
LSG - Load Share Gateway
© Woodward
Page 27/32
EGCP-2 Configuration
≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡
•
One EGCP-2 must be configured as the system master. It is recommended to configure the master unit
with device number 1 and priority number 1. The EGCP-2 device numbers must
not
be configured as 8,
because the LSG is using this device number.
•
The EGCP-2 must be operating in the automatic mode. The Auto discrete input #1 must be closed on
this unit at all times.
•
The configuration item Auto Sequencing must be set to disabled.
•
Please configure DIP switch of the EGCP-2s to a correct termination of the RS-485
•
The LSG is always slave
•
If reactive power needs to be shared, the parameters “RATED KW” and “RATED KVAR” must be con-
figured to the same values within the EGCP-2.
GCP/MFR Configuration
≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡
•
With the exception of number 8 all generator numbers can be configured. Generator
number 8 is not al-
lowed
because the LSG is using generator number 8.
•
Please make sure that easYgen the parameters “Active power load share” (parameter 5531) and “Reac-
tive power load share” (parameter 5631) are configured identical than the corresponding GCP/MFR pa-
rameters.
NOTE
Please refer to the note “Dead bus closure interlock” on page 12.