Rev 5.2/12-21
P1-DC3: #35123
7
1) Remove all shipping materials and save them with the shipping container for future use.
2)
2A
Adjust the lift point to optimize the lifter's
hang angle:
2.1) Remove the retaining bolt and loosen
the pivot bolt (fig. 2A).
2.2) Move the lift point to the appropriate
position.
1
2.3) Reinstall the retaining bolt and tighten
both bolts securely.
3) Suspend the lifter from appropriate
hoisting equipment:
3.1) Select a crane and/or hoist rated for the Maximum Load Capacity plus the
Lifter Weight.
Note: Any lifter use must comply with all statutory or regulatory standards for hoisting
equipment in your region.
3A
3B
3C
3.2) Disengage the tilt latch and raise the lift bar (fig. 3A-C).
1..... Moving the lift point
forward
(away from operator) helps keep the hang angle vertical while the lifter is
loaded
; moving the lift point
rearward
(towards operator) helps keep the hang angle vertical while the lifter is
unloaded
.
ASSEMBLY
Содержание 98720
Страница 2: ...P1 DC3 35123 Rev 5 2 12 21 2 ...
Страница 6: ...P1 DC3 35123 Rev 5 2 12 21 4 SPECIFICATIONS Note A standard P11104DC3 is shown ...
Страница 42: ...P1 DC3 35123 Rev 5 2 12 21 40 ...
Страница 43: ...Rev 5 2 12 21 P1 DC3 35123 41 ...