
PG
10
OF
48
M0037.09 SEPTEMBER 2019
Mountain Series CE
Installation and Operation Manual
FRONT PANEL ASSEMBLY
STANDARD FRONT PANEL AND TOE KICK ASSEMBLY INSTRUCTIONS
D
D
B
D
D
B
D
D
D
D
C
C
A
A
Controller
Flame Height Control Knob
Transformer Box
Contains terminal strip for incoming power supply.
NOTE: Have licensed electrician make this electrical connection
Service Panel
The Flame Height Control Knob position can
be adjusted inward or outward by loosening
the Clamp and sliding the throttle knob
assembly to the desired position� Be sure to
retighten the Clamp once the Flame Height
Control Knob is in the desired position�
Flame Height
Control Knob
Throttle Bracket
(already attached)
Pointer
Collar/
Pointer
Clamp
EMT Throttle Rod
Extension
Throttle Valve
Cotter Pin
SERVICE PANEL THROTTLE ASSEMBLY
A
Hex-head self-tapping screw� Used to
attach Toe Kick� 5 total�
B
Phillips head 1/4-20 screw� Used to attach
Service Panel to Controller bracket� 2 total�
C
Phillips head #10 screw� Used to attach
Service Panel to Throttle Knob Bracket� 2 total�
D
Phillips head self-tapping screw� Used to
secure the sides of the Service Panel� 8 total�
FRONT PANEL ASSEMBLY
Содержание MOUNTAIN Series
Страница 44: ...PG 44 OF 48 M0037 09 SEPTEMBER 2019 Blank page ...
Страница 45: ...PG 45 OF 48 M0037 09 SEPTEMBER 2019 Blank page ...
Страница 46: ...PG 46 OF 48 M0037 09 SEPTEMBER 2019 Blank page ...