![Wood-mizer SW-10 SETWORKS Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/wood-mizer/sw-10-setworks/sw-10-setworks_user-manual_994470006.webp)
INSTALLATION
SW-10 Controller Installation Procedure on the LT15 Sawmills
1
1-2
SW-10doc111419
INSTALLATION
3.
Install the encoder.
See Photo 1-1.
4.
Route the encoder wire inside the mast to the controller. Connect wires to the encoder
terminals according to the table below.
CAUTION!
If the encoder impulses counting direction is not
consistent with the real one, the controller will not work
correctly (the saw head height on the controller display is
rising during saw head downward movement) - then the
connection of wires to W1 & W2 inputs should be inverted.
PHOTO 1-1
Encoder
In1
White
In2
Yellow
[+]
Brown
[-]
Green
TABLE 1-1
Содержание SW-10 SETWORKS
Страница 1: ......
Страница 2: ......
Страница 34: ...Troubleshooting Setworks Malfunction 3 3 3 SW 10doc111419 Troubleshooting FIG 3 1 Sensor Alignment Bolts 4 ...