![Wood-mizer SW-10 SETWORKS Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/wood-mizer/sw-10-setworks/sw-10-setworks_user-manual_994470005.webp)
INSTALLATION
SW-10 Controller Installation Procedure on the LT15 Sawmills
INSTALLATION
SW-10doc111419
1-1
1
SECTION 1 INSTALLATION
1.1
SW-10 Controller Installation Procedure on the LT15 Sawmills
IMPORTANT!
Make sure the sawmill is properly set up
before performing setworks installation and/or operation.
WARNING!
Before performing any service to the sawmill
control box panel, turn the key to the “0”. Set the main
switch, located on the control box in “0” position and
disconnect the power supply cable. In DC sawmills unplug
the battery cables. Failure to do so may cause serious
injury and machine damage.
1.
Replace the control panel bracket.
2.
Mount the controller box to the bracket.
Содержание SW-10 SETWORKS
Страница 1: ......
Страница 2: ......
Страница 34: ...Troubleshooting Setworks Malfunction 3 3 3 SW 10doc111419 Troubleshooting FIG 3 1 Sensor Alignment Bolts 4 ...