
LubeMizer Installation
Control Box Wiring
1
1-6
LMS99doc032619
LubeMizer Installation
1.4
Control Box Wiring
LT30
Rev. F7.00+
LT40
Rev. F8.00+
LT30HD/40HD
Rev. G1.00+
DANGER!
The key switch should still be off, the key
removed and the negative battery cable disconnected as
stated at the beginning of this section. The incoming power
supply of electric-powered sawmills should be discon-
nected and locked out. Failure to do so will result in serious
injury or death.
IMPORTANT!
Avoid pinch and pivot points, unnecessary
wire bending and open spaces where the wire could get
caught by a log, etc. If you have any questions, call
Wood-Mizer customer service.
Refer to the appropriate wiring diagram while performing the wiring steps below.
Locate red wire #19 lying loose in the sawmill control box.
NOTE:
Install a male con-
nector to the end of wire #19 if one is not already supplied. Connect red lube wire
#251 to red wire #19.
NOTE: If you have installed a water lube solenoid kit (#016141) there will be a fuse-
holder assembly between wire #19 and the #2 drum switch terminal. Unplug the
fuse holder assembly from wire #19 and plug red lube wire #251 in its place. Leave
the assembly wire connected to the #2 drum switch terminal, but cut the wire 5"
from the terminal. Install a female terminal to the end and connect red lube wire
#250 to the female terminal.
Rev. A.00 - A.01:
Locate the larger 10-gauge red wire connected to the #2 power
feed drum switch terminal inside the control box. Crimp the supplied yellow T-tap
terminal around the wire. Plug red lube wire #250 into the T-tap terminal.
See Figure 1-3.