![Wood master Ultra Series Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/wood-master/ultra-series/ultra-series_user-manual_994289016.webp)
16
Ultra Owners Manual
2015
Installation
5. Side the assembly through the hole in the side of
the furnace until the T-pipe contacts the siding.
8. Slide the blue tube to the outlet of the T-pipe, and
connect the tipping chute fitting to the other end of
the blue tube. The auger is now ready to be connected
to the hopper.
7. Slide the inlet pipe over the auger tube. The hole in
the inlet pipe should be 180 degrees towards the out
-
let on the T-pipe. Fasten the screw shown to lock the
inlet pipe in place. Apply a bead of caulking the joint
of the inlet pipe and auger tube to prevent water from
reaching the pellets.
6. Hang the motor on the hook that is located under
the roof of the furnace using the hanger on the motor
that is by the T-pipe set screw. If a three link chain is
supplied with the auger head, used the chain to attach
the auger head to the hook.
Содержание Ultra Series
Страница 42: ...42 Ultra Owners Manual 2015 Notes ...
Страница 43: ...43 Ultra Owners Manual 2015 Notes ...