4.2. PREPARING THE BASE
Careful planning at an early stage will greatly help the installation process and make sure that all
the required clearances are adhered to for servicing and that any potential issues with the routing
of the flue can be resolved.
The ECOMPACT pellet boiler should be positioned on a concrete plinth at least 50mm high and
should project a min. 300mm beyond the sides and the front of the appliance .The plinth must be
capable of supporting the weight of the appliance when full with fuel and the plumbing system has
been filled with water.
Use the template below for constructing the plinth and for positioning the flow and return
pipework and electrical supply.
ECOMPACT 40
Page 14
Installation & Assembly
© Wood Energy Solutions
Refer to service and access clearances around the appliance on Page 8
woodenergysolutions.co.uk
600
600
150
300
Содержание E-COMPACT 40
Страница 1: ...Installation Operation Manual E COMPACT 40 Wood Pellet Boiler woodenergysolutions co uk V 1 0 08 14 ...
Страница 2: ......
Страница 21: ...Control System ECOMPACT 40 Page 19 5 CONTROL SYSTEM Wood Energy Solutions woodenergysolutions co uk ...
Страница 31: ...ECOMPACT 40 Page 33 Boiler Operation Maintenance Wood Energy Solutions woodenergysolutions co uk ...