6
|
Wolf Customer Care 800.222.7820
INSTALLATION
Preparation
Prepare the finished opening for the rangetop according
to dimensions shown in the illustration on page 5. The plat-
form must be
3
/
4
"
(19)
thick and include a cut-out at the right
rear for electrical and gas supply connections. The platform
must be level to ensure that the cooking surface is level.
Placement
Use an appliance dolly to move the unit near the opening.
Remove and recycle packing materials.
If a riser has been specified, refer to the installation instruc-
tions packaged with the riser. The riser must be installed
before the rangetop is installed.
Place unit into the opening. Connect gas and electrical.
Connections may need to be made prior to final placement.
Gas Supply Connection
All connections to the gas piping must be wrench-tightened.
Do not overtighten or allow pipes to turn when tightening.
If a flexible metal connector is being used, verify it is not
kinked, then attach the gas supply line to the regulator on
the rangetop. Open the valve and check for leaks by placing
a liquid detergent solution onto all gas connections. Bubbles
around connections indicate a gas leak. If a leak appears,
close the shut-off valve and adjust connections.